A platform for research: civil engineering, architecture and urbanism
First-pile-method pile shoe type jacket structure and construction method thereof
The invention discloses a first-pile-method pile shoe type jacket structure and a construction method thereof, and aims to provide the first-pile-method pile shoe type jacket structure and the construction method thereof which can avoid underwater pile cutting operation, so that the construction difficulty and the construction cost are reduced, and the construction efficiency is improved. A first pile method pile shoe type jacket structure comprises a plurality of steel pipe piles, a plurality of pile shoes and a jacket body, the pile shoes are fixedly connected to the bottom of the jacket body, the steel pipe piles are sleeved with the pile shoes, each steel pipe pile is sleeved with the corresponding pile shoe, and limiting supporting components are arranged at the tops of the pile shoes. The pile shoe is supported on the top of the steel pipe pile through the limiting supporting component. During actual construction, the pile shoes on the steel pipe piles are located at the same height by adjusting the limiting supporting components according to the top elevation of the steel pipe piles.
本发明公开了一种先桩法桩靴式导管架结构及其施工方法,旨在提供一种能够避免水下割桩作业,从而降低施工难度与施工成本,并提高施工效率的一种先桩法桩靴式导管架结构及其施工方法。一种先桩法桩靴式导管架结构,包括若干钢管桩、若干桩靴及导管架主体,桩靴固定连接在导管架主体的底部,桩靴套设在钢管桩上,且每根钢管桩上均套设有所述的桩靴,桩靴的顶部设置有限位支撑部件,桩靴通过限位支撑部件支撑在钢管桩的顶部。实际施工时,根据各钢管桩的顶高程,通过调整限位支撑部件,以使各钢管桩上的桩靴位于同一高度。
First-pile-method pile shoe type jacket structure and construction method thereof
The invention discloses a first-pile-method pile shoe type jacket structure and a construction method thereof, and aims to provide the first-pile-method pile shoe type jacket structure and the construction method thereof which can avoid underwater pile cutting operation, so that the construction difficulty and the construction cost are reduced, and the construction efficiency is improved. A first pile method pile shoe type jacket structure comprises a plurality of steel pipe piles, a plurality of pile shoes and a jacket body, the pile shoes are fixedly connected to the bottom of the jacket body, the steel pipe piles are sleeved with the pile shoes, each steel pipe pile is sleeved with the corresponding pile shoe, and limiting supporting components are arranged at the tops of the pile shoes. The pile shoe is supported on the top of the steel pipe pile through the limiting supporting component. During actual construction, the pile shoes on the steel pipe piles are located at the same height by adjusting the limiting supporting components according to the top elevation of the steel pipe piles.
本发明公开了一种先桩法桩靴式导管架结构及其施工方法,旨在提供一种能够避免水下割桩作业,从而降低施工难度与施工成本,并提高施工效率的一种先桩法桩靴式导管架结构及其施工方法。一种先桩法桩靴式导管架结构,包括若干钢管桩、若干桩靴及导管架主体,桩靴固定连接在导管架主体的底部,桩靴套设在钢管桩上,且每根钢管桩上均套设有所述的桩靴,桩靴的顶部设置有限位支撑部件,桩靴通过限位支撑部件支撑在钢管桩的顶部。实际施工时,根据各钢管桩的顶高程,通过调整限位支撑部件,以使各钢管桩上的桩靴位于同一高度。
First-pile-method pile shoe type jacket structure and construction method thereof
一种先桩法桩靴式导管架结构及其施工方法
JIN SHENGJU (author) / HUANG JIAJIA (author) / HUANG YUPEI (author) / JIN TAO (author) / ZUO CHAOQUN (author) / FANG WEIDING (author) / HUANG JIANWU (author) / ZHANG YUELONG (author) / ZHANG QIANG (author)
2024-12-06
Patent
Electronic Resource
Chinese
Offshore wind power pile shoe expansion type jacket foundation
European Patent Office | 2021
|Jacket swirling pile foundation structure and construction method thereof
European Patent Office | 2020
|Rear pile method deepwater jacket pile inserting device and construction method thereof
European Patent Office | 2024
|Prefabricated hollow pile pipe valve-type pile shoe and construction method thereof
European Patent Office | 2021
|