Waterproof construction method for post-cast strip of basement wall
The invention relates to building construction, in particular to a waterproof construction method for a post-cast strip of a basement wall. Comprising the following steps that S1, reinforcing steel bars of a basement wall body are bound, and formworks are erected; s2, basement wall bodies on the two sides of the post-cast strip are poured and maintained; s3, precast concrete prefabricated slabs are prefabricated; s4, the post-cast strip and wall base layers on the two sides of the post-cast strip are cleaned; s5, concrete prefabricated slab installation is conducted, specifically, the concrete prefabricated slab is installed on the post-cast strip, and gaps are filled with mortar; and S6, waterproof coiled materials are laid on the wall surfaces, and the waterproof coiled materials are laid on the concrete prefabricated plates and the basement wall bodies on the two sides of the concrete prefabricated plates. According to the method, the problem of waterproof roll construction delay caused by the basement outer wall post-cast strip is effectively solved, the underground foundation pit can be backfilled in advance for construction, the potential safety hazard is eliminated, meanwhile, construction conditions are provided for erection of an upper structure frame body, and the construction period is shortened.
本发明涉及建筑施工,特别是一种地下室墙体后浇带防水施工方法。包括如下步骤:S1、地下室墙体的钢筋绑扎和模板支设;S2、后浇带两侧的地下室墙体浇筑、养护;S3、预制混凝土预制板;S4、后浇带及后浇带两侧的墙体基层清理;S5、混凝土预制板安装,将混凝土预制板安装在后浇带上,使用砂浆填充缝隙;S6、墙面铺贴防水卷材,在混凝土预制板和混凝土预制板两侧的地下室墙体上铺设防水卷材。本发明有效解决由于地下室外墙后浇带造成的防水卷材施工延后的问题,可提前对地下基坑回填进行施工,消除安全隐患的同时,为上部结构架体搭设提供施工条件,缩短施工工期。
Waterproof construction method for post-cast strip of basement wall
The invention relates to building construction, in particular to a waterproof construction method for a post-cast strip of a basement wall. Comprising the following steps that S1, reinforcing steel bars of a basement wall body are bound, and formworks are erected; s2, basement wall bodies on the two sides of the post-cast strip are poured and maintained; s3, precast concrete prefabricated slabs are prefabricated; s4, the post-cast strip and wall base layers on the two sides of the post-cast strip are cleaned; s5, concrete prefabricated slab installation is conducted, specifically, the concrete prefabricated slab is installed on the post-cast strip, and gaps are filled with mortar; and S6, waterproof coiled materials are laid on the wall surfaces, and the waterproof coiled materials are laid on the concrete prefabricated plates and the basement wall bodies on the two sides of the concrete prefabricated plates. According to the method, the problem of waterproof roll construction delay caused by the basement outer wall post-cast strip is effectively solved, the underground foundation pit can be backfilled in advance for construction, the potential safety hazard is eliminated, meanwhile, construction conditions are provided for erection of an upper structure frame body, and the construction period is shortened.
本发明涉及建筑施工,特别是一种地下室墙体后浇带防水施工方法。包括如下步骤:S1、地下室墙体的钢筋绑扎和模板支设;S2、后浇带两侧的地下室墙体浇筑、养护;S3、预制混凝土预制板;S4、后浇带及后浇带两侧的墙体基层清理;S5、混凝土预制板安装,将混凝土预制板安装在后浇带上,使用砂浆填充缝隙;S6、墙面铺贴防水卷材,在混凝土预制板和混凝土预制板两侧的地下室墙体上铺设防水卷材。本发明有效解决由于地下室外墙后浇带造成的防水卷材施工延后的问题,可提前对地下基坑回填进行施工,消除安全隐患的同时,为上部结构架体搭设提供施工条件,缩短施工工期。
Waterproof construction method for post-cast strip of basement wall
地下室墙体后浇带防水施工方法
YU HUI (author) / DU RUIGANG (author) / ZHANG RUI (author) / SANG ZHENLIN (author) / LI XIAOTENG (author)
2024-12-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement exterior wall post-cast strip waterproof structure and construction method thereof
European Patent Office | 2024
|Construction method for post-cast strip of waterproof shear wall of basement
European Patent Office | 2021
|Basement exterior wall post-cast strip plugging waterproof device and construction method thereof
European Patent Office | 2024
|Basement post-cast strip waterproof structure and construction method thereof
European Patent Office | 2020
|Anti-crack waterproof construction process for post-cast strip of basement exterior wall
European Patent Office | 2021
|