A platform for research: civil engineering, architecture and urbanism
Intercepting well
The invention discloses a catch basin and a catch basin chamber, the catch basin chamber is sequentially and longitudinally divided into a confluence area, a catch area 7 and a water outlet area 8 by a first partition plate and a second partition plate which are parallel to each other, the confluence area further comprises a water inlet area 5 and an overflow area 6 which are longitudinally divided by a third partition plate perpendicular to the first partition plate, and water enters the water inlet area 5 through a confluence water inlet pipe 1; the intercepting water inlet pipe 3 horizontally penetrates through the intercepting water inlet pipe; water enters the overflow area 6 through an overflow port in the third partition plate, and is drained through a combined water outlet pipe 2; water enters the intercepting area 7 through an intercepting opening in the first partition plate, and the intercepting area 7 is horizontally penetrated by the intercepting water inlet pipe 3; water enters the water outlet area 8 through the intercepting water inlet pipe 3 and a water outlet in the second partition plate, water is drained through the intercepting water outlet pipe 4, and by means of the integrated intercepting well structure, the occupied area of the intercepting well is reduced, the construction face of the intercepting well is reduced, and the intercepting well is suitable for sewage intercepting projects on the shoreside or other narrow paths.
本发明公开了一种截流井,截流井室,该截流井室依次被平行的第一隔板、第二隔板纵向分隔的合流区、截流区7和出水区8,该合流区进一步包括被垂直于该第一隔板的第三隔板纵向分隔的进水区5和溢流区6,其中:该进水区5经由合流进水管1进水,并被截流进水管3水平贯穿;该溢流区6经由该第三隔板上的溢流口进水,并经由合流出水管2排水;该截流区7经由该第一隔板上的截流口进水,并被该截流进水管3水平贯穿;该出水区8经由该截流进水管3和该第二隔板上的出水口进水,并经由截流出水管4排水,通过一体化的截流井结构,从而缩小截流井的占地,减少其施工面,使其适于岸边或其他窄路的截污工程。
Intercepting well
The invention discloses a catch basin and a catch basin chamber, the catch basin chamber is sequentially and longitudinally divided into a confluence area, a catch area 7 and a water outlet area 8 by a first partition plate and a second partition plate which are parallel to each other, the confluence area further comprises a water inlet area 5 and an overflow area 6 which are longitudinally divided by a third partition plate perpendicular to the first partition plate, and water enters the water inlet area 5 through a confluence water inlet pipe 1; the intercepting water inlet pipe 3 horizontally penetrates through the intercepting water inlet pipe; water enters the overflow area 6 through an overflow port in the third partition plate, and is drained through a combined water outlet pipe 2; water enters the intercepting area 7 through an intercepting opening in the first partition plate, and the intercepting area 7 is horizontally penetrated by the intercepting water inlet pipe 3; water enters the water outlet area 8 through the intercepting water inlet pipe 3 and a water outlet in the second partition plate, water is drained through the intercepting water outlet pipe 4, and by means of the integrated intercepting well structure, the occupied area of the intercepting well is reduced, the construction face of the intercepting well is reduced, and the intercepting well is suitable for sewage intercepting projects on the shoreside or other narrow paths.
本发明公开了一种截流井,截流井室,该截流井室依次被平行的第一隔板、第二隔板纵向分隔的合流区、截流区7和出水区8,该合流区进一步包括被垂直于该第一隔板的第三隔板纵向分隔的进水区5和溢流区6,其中:该进水区5经由合流进水管1进水,并被截流进水管3水平贯穿;该溢流区6经由该第三隔板上的溢流口进水,并经由合流出水管2排水;该截流区7经由该第一隔板上的截流口进水,并被该截流进水管3水平贯穿;该出水区8经由该截流进水管3和该第二隔板上的出水口进水,并经由截流出水管4排水,通过一体化的截流井结构,从而缩小截流井的占地,减少其施工面,使其适于岸边或其他窄路的截污工程。
Intercepting well
一种截流井
QIAO XIN (author) / LI ZHICHENG (author) / GUO XINYU (author) / HAN WEIQIANG (author) / GUO ZIYU (author) / CHENG SHUHUI (author) / ZHAI YUANXIN (author)
2024-12-06
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Intercepting device, intercepting well and intercepting method
European Patent Office | 2024
|Intelligent intercepting well control method, automatic intercepting well, equipment and medium
European Patent Office | 2024
|