A platform for research: civil engineering, architecture and urbanism
Assembly type building structure installation and construction method
The invention relates to the technical field of assembly type building construction, and particularly discloses an assembly type building structure installation construction method which comprises the steps that a building foundation with an anti-floating structure is constructed, and then prefabricated columns, prefabricated floor slabs and prefabricated beam slabs are installed on the anti-floating foundation; the prefabricated columns are inserted and connected into the prefabricated columns on the upper layer through column ribs on the heads, meanwhile, the structures and construction processes of prefabricated beam plates and prefabricated floor slabs are optimized, the prefabrication efficiency is improved, meanwhile, structural form optimization is conducted on the connection portions of the prefabricated parts, and therefore the prefabricated parts are not prone to deformation in the mutual connection process of the prefabricated parts. And in the connecting process of the prefabricated part and the cast-in-place structure, the connecting firmness can be improved, it is guaranteed that the connecting part is safe and reliable, an overall and complete fabricated building overall structure is formed, and construction safety and later use safety are guaranteed.
本发明涉及装配式建筑施工技术领域,具体公开了一种装配式建筑结构安装施工方法,该施工方法通过施工带有抗浮结构的建筑基础,然后在抗浮基础上安装预制柱、预制楼板和预制梁板,预制柱通过头部的柱筋插入连接在上一层的预制柱中,同时优化预制梁板及预制楼板的结构和施工工艺,提高了预制制作效率,同时对预制构件连接部位进行结构形式优化,使得预制构件相互连接过程中,以及预制构件在与现浇结构连接过程中,能提高连接牢固性,保证连接部位安全可靠,形成整体完整的装配式建筑整体结构,保证施工安全及后期使用安全。
Assembly type building structure installation and construction method
The invention relates to the technical field of assembly type building construction, and particularly discloses an assembly type building structure installation construction method which comprises the steps that a building foundation with an anti-floating structure is constructed, and then prefabricated columns, prefabricated floor slabs and prefabricated beam slabs are installed on the anti-floating foundation; the prefabricated columns are inserted and connected into the prefabricated columns on the upper layer through column ribs on the heads, meanwhile, the structures and construction processes of prefabricated beam plates and prefabricated floor slabs are optimized, the prefabrication efficiency is improved, meanwhile, structural form optimization is conducted on the connection portions of the prefabricated parts, and therefore the prefabricated parts are not prone to deformation in the mutual connection process of the prefabricated parts. And in the connecting process of the prefabricated part and the cast-in-place structure, the connecting firmness can be improved, it is guaranteed that the connecting part is safe and reliable, an overall and complete fabricated building overall structure is formed, and construction safety and later use safety are guaranteed.
本发明涉及装配式建筑施工技术领域,具体公开了一种装配式建筑结构安装施工方法,该施工方法通过施工带有抗浮结构的建筑基础,然后在抗浮基础上安装预制柱、预制楼板和预制梁板,预制柱通过头部的柱筋插入连接在上一层的预制柱中,同时优化预制梁板及预制楼板的结构和施工工艺,提高了预制制作效率,同时对预制构件连接部位进行结构形式优化,使得预制构件相互连接过程中,以及预制构件在与现浇结构连接过程中,能提高连接牢固性,保证连接部位安全可靠,形成整体完整的装配式建筑整体结构,保证施工安全及后期使用安全。
Assembly type building structure installation and construction method
一种装配式建筑结构安装施工方法
LIU YANG (author) / CHENG ZIQIANG (author) / ZHANG HONGCAI (author) / TENG FENG (author) / ZHANG GANG (author) / ZHAO XUEMIN (author) / ZHAO JIXIANG (author) / QI JIAN (author)
2024-12-06
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|European Patent Office | 2020
|Assembly type building construction installation protective fence
European Patent Office | 2021
|Assembly type building PC component installation and construction method
European Patent Office | 2021
|Installation construction method for assembly type building PC components
European Patent Office | 2020
|