Construction method for erecting straddle type monorail turnout by adopting tire portal crane
The invention relates to a construction method for erecting a straddle type monorail turnout by adopting a tire portal crane, which comprises the following steps of: S1, investigating engineering field conditions before construction, familiar with equipment installation drawings, and determining a construction scheme, a transportation sequence and a route; s2, after the straddle type monorail turnout is manufactured, according to the construction scheme, the transportation mode, the transportation sequence and the route determined in the step S1, all parts of turnout equipment are transported to an equipment installation site; s3, the installation personnel are familiar with the equipment installation drawing, and installation of turnout parts is completed in sequence according to the determined construction scheme and the installation sequence of all the parts; s4, after the turnout equipment is installed, the installation quality of the equipment is inspected, and it is ensured that the construction quality meets the requirement; and S5, after passing the inspection, reporting completion acceptance, and ensuring that the engineering economic benefit and the construction quality completely meet the installation quality requirements of the turnout equipment. The method has the advantages that the underground engineering problem is solved, and efficiency and quality are guaranteed.
本发明涉及一种采用轮胎门式起重机架设跨座式单轨道岔的施工方法,包括以下步骤:S1:施工前对工程现场条件进行勘察,熟悉设备安装图纸,确定施工方案、运输顺序及路线;S2:跨座式单轨道岔制造完成后,按照步骤S1中确定的施工方案、运输方式、运送顺序及路线,将道岔设备各零部件运送至设备安装现场;S3:安装人员熟悉设备安装图纸,按照确定的施工方案及各零部件安装顺序依次完成道岔零部件的安装;S4:道岔设备安装完成后,对设备安装质量进行检验,确保施工质量符合要求;S5:经检验合格后,报请完工验收,确保工程经济效益和施工质量完全达到道岔设备安装质量要求。本发明具有解决地下工程难题、保证效率和质量的优点。
Construction method for erecting straddle type monorail turnout by adopting tire portal crane
The invention relates to a construction method for erecting a straddle type monorail turnout by adopting a tire portal crane, which comprises the following steps of: S1, investigating engineering field conditions before construction, familiar with equipment installation drawings, and determining a construction scheme, a transportation sequence and a route; s2, after the straddle type monorail turnout is manufactured, according to the construction scheme, the transportation mode, the transportation sequence and the route determined in the step S1, all parts of turnout equipment are transported to an equipment installation site; s3, the installation personnel are familiar with the equipment installation drawing, and installation of turnout parts is completed in sequence according to the determined construction scheme and the installation sequence of all the parts; s4, after the turnout equipment is installed, the installation quality of the equipment is inspected, and it is ensured that the construction quality meets the requirement; and S5, after passing the inspection, reporting completion acceptance, and ensuring that the engineering economic benefit and the construction quality completely meet the installation quality requirements of the turnout equipment. The method has the advantages that the underground engineering problem is solved, and efficiency and quality are guaranteed.
本发明涉及一种采用轮胎门式起重机架设跨座式单轨道岔的施工方法,包括以下步骤:S1:施工前对工程现场条件进行勘察,熟悉设备安装图纸,确定施工方案、运输顺序及路线;S2:跨座式单轨道岔制造完成后,按照步骤S1中确定的施工方案、运输方式、运送顺序及路线,将道岔设备各零部件运送至设备安装现场;S3:安装人员熟悉设备安装图纸,按照确定的施工方案及各零部件安装顺序依次完成道岔零部件的安装;S4:道岔设备安装完成后,对设备安装质量进行检验,确保施工质量符合要求;S5:经检验合格后,报请完工验收,确保工程经济效益和施工质量完全达到道岔设备安装质量要求。本发明具有解决地下工程难题、保证效率和质量的优点。
Construction method for erecting straddle type monorail turnout by adopting tire portal crane
一种采用轮胎门式起重机架设跨座式单轨道岔的施工方法
YANG PINGGANG (author) / YUAN RUI (author)
2024-12-13
Patent
Electronic Resource
Chinese