A platform for research: civil engineering, architecture and urbanism
Soft foundation compacting and drainage reinforcing method combining high-pressure sand blasting pile and heaped loading
The invention discloses a high-pressure sand blasting pile combined loading soft foundation compaction and drainage reinforcement method which comprises the following steps: step 1, firstly, leveling a site, then, carrying out soft foundation exploration, ascertaining a geologic structure in a soft soil foundation to be treated, and then, paving a lower drainage cushion layer; step 2, measuring a discharge point, and placing a pile forming system in place; thirdly, a pile forming system is used, a hole is drilled in the pile forming point position, then high-pressure rotary jet grouting pile forming construction is conducted, and a high-pressure sand jet pile is constructed; 4, paving a drainage cushion layer on the upper layer, and arranging a water filter pipe in the drainage cushion layer; 5, geotextile is laid on the drainage cushion layer, and a water filter pipe in the drainage cushion layer is led out and connected with a drainage system; and sixthly, stacking and loading materials on the geotechnical cloth step by step, and carrying out stacking and pre-pressing drainage on the soft soil foundation.
本发明公开了一种高压喷射砂桩联合堆载的软基密实、排水加固方法,包括以下步骤:步骤一,首先场地整平,之后进行软基勘探,探明待处理的软土地基中的地质结构,然后摊铺下层的排水垫层;步骤二,测量放点,并就位成桩系统;步骤三,使用成桩系统,先在成桩点位钻孔,之后进行高压旋喷成桩施工,构建高压喷射砂桩;步骤四,摊铺上层的排水垫层,排水垫层内布设滤水管;步骤五,排水垫层上铺设土工布,将排水垫层内的滤水管引出,与排水系统相连接;步骤六,土工布上逐级堆载堆载料,对软土地基进行堆载预压排水。
Soft foundation compacting and drainage reinforcing method combining high-pressure sand blasting pile and heaped loading
The invention discloses a high-pressure sand blasting pile combined loading soft foundation compaction and drainage reinforcement method which comprises the following steps: step 1, firstly, leveling a site, then, carrying out soft foundation exploration, ascertaining a geologic structure in a soft soil foundation to be treated, and then, paving a lower drainage cushion layer; step 2, measuring a discharge point, and placing a pile forming system in place; thirdly, a pile forming system is used, a hole is drilled in the pile forming point position, then high-pressure rotary jet grouting pile forming construction is conducted, and a high-pressure sand jet pile is constructed; 4, paving a drainage cushion layer on the upper layer, and arranging a water filter pipe in the drainage cushion layer; 5, geotextile is laid on the drainage cushion layer, and a water filter pipe in the drainage cushion layer is led out and connected with a drainage system; and sixthly, stacking and loading materials on the geotechnical cloth step by step, and carrying out stacking and pre-pressing drainage on the soft soil foundation.
本发明公开了一种高压喷射砂桩联合堆载的软基密实、排水加固方法,包括以下步骤:步骤一,首先场地整平,之后进行软基勘探,探明待处理的软土地基中的地质结构,然后摊铺下层的排水垫层;步骤二,测量放点,并就位成桩系统;步骤三,使用成桩系统,先在成桩点位钻孔,之后进行高压旋喷成桩施工,构建高压喷射砂桩;步骤四,摊铺上层的排水垫层,排水垫层内布设滤水管;步骤五,排水垫层上铺设土工布,将排水垫层内的滤水管引出,与排水系统相连接;步骤六,土工布上逐级堆载堆载料,对软土地基进行堆载预压排水。
Soft foundation compacting and drainage reinforcing method combining high-pressure sand blasting pile and heaped loading
一种高压喷射砂桩联合堆载的软基密实、排水加固方法
YU ZHIFA (author) / YUAN FANGLONG (author) / LIU AIMIN (author) / LIU XU (author) / WANG JIANNAN (author) / ZHU NAN (author) / WANG RONGLI (author) / ZHUGE AIJUN (author) / LIU TIANYUN (author) / LIU HEWEN (author)
2024-12-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Method for reinforcing vacuum preloading soft foundation by using high-pressure sand blasting pile
European Patent Office | 2024
|Soft soil foundation reinforcing method for accelerating drainage through blasting
European Patent Office | 2021
|European Patent Office | 2023
|Construction method for treating foundation slope through heaped loading method
European Patent Office | 2024
|Effective Blasting Method of Compacting Sand Foundation Beds for Various Structures
Online Contents | 2018
|