Climbing frame installation construction method
The invention relates to the technical field of building engineering construction, and discloses a climbing frame installation construction method which comprises the following steps: S1, selecting a cantilever layer from a building house, and enabling the cantilever layer to be located above the horizon; s2, a cantilever I-shaped steel platform is selected, the cantilever I-shaped steel platform is fixed to the cantilever layer, and the cantilever I-shaped steel platform is located outside the building house; and S3, the cantilever I-shaped steel platform supports the climbing frame, and the climbing frame is fixed to the building house. According to the installation and construction method of the climbing frame, the climbing frame can be installed more rapidly, simply and conveniently, meanwhile, the problem that construction of other working procedures of the basement outer wall cannot be conducted in the installation process of the climbing frame is solved, and peak shifting construction of climbing frame installation and remaining working procedures of the basement outer wall is achieved.
本发明涉及建筑工程施工技术领域,公开了一种爬架安装施工方法,安装施工方法包括以下步骤:S1、从建筑房屋上选定悬挑层,悬挑层位于地平线以上;S2、选定悬挑工字钢平台,将悬挑工字钢平台固定在悬挑层上,悬挑工字钢平台位于建筑房屋的外部;S3、悬挑工字钢平台对爬架进行支撑,且爬架固定在建筑房屋上。本发明的爬架安装施工方法,既可以使爬架的安装更加快捷、简便,同时解决爬架安装过程中无法进行地下室外墙的其他工序施工的问题,还实现爬架安装与地下室外墙剩余工序的错峰施工。
Climbing frame installation construction method
The invention relates to the technical field of building engineering construction, and discloses a climbing frame installation construction method which comprises the following steps: S1, selecting a cantilever layer from a building house, and enabling the cantilever layer to be located above the horizon; s2, a cantilever I-shaped steel platform is selected, the cantilever I-shaped steel platform is fixed to the cantilever layer, and the cantilever I-shaped steel platform is located outside the building house; and S3, the cantilever I-shaped steel platform supports the climbing frame, and the climbing frame is fixed to the building house. According to the installation and construction method of the climbing frame, the climbing frame can be installed more rapidly, simply and conveniently, meanwhile, the problem that construction of other working procedures of the basement outer wall cannot be conducted in the installation process of the climbing frame is solved, and peak shifting construction of climbing frame installation and remaining working procedures of the basement outer wall is achieved.
本发明涉及建筑工程施工技术领域,公开了一种爬架安装施工方法,安装施工方法包括以下步骤:S1、从建筑房屋上选定悬挑层,悬挑层位于地平线以上;S2、选定悬挑工字钢平台,将悬挑工字钢平台固定在悬挑层上,悬挑工字钢平台位于建筑房屋的外部;S3、悬挑工字钢平台对爬架进行支撑,且爬架固定在建筑房屋上。本发明的爬架安装施工方法,既可以使爬架的安装更加快捷、简便,同时解决爬架安装过程中无法进行地下室外墙的其他工序施工的问题,还实现爬架安装与地下室外墙剩余工序的错峰施工。
Climbing frame installation construction method
一种爬架安装施工方法
DING ENLIANG (author) / LI ZEGANG (author) / LI JINZHOU (author)
2024-12-13
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Cast-in-place outer wall window frame installation construction method based on climbing frame
European Patent Office | 2023
|Climbing frame fixing structure and building construction climbing frame
European Patent Office | 2023
|Climbing frame system and modular installation method thereof
European Patent Office | 2024
|