A platform for research: civil engineering, architecture and urbanism
Jacking slope adjusting bridge prefabricated assembly type pier and construction method thereof
The invention relates to a jacking slope-adjusting bridge prefabricated assembly type pier and a construction method thereof, and belongs to the technical field of bridge maintenance and reinforcement, the jacking slope-adjusting bridge prefabricated assembly type pier comprises a mounting platform, a sleeve is arranged on the mounting platform, the sleeve is used for being connected with a longitudinal steel bar for dismantling the pier in a sleeving mode, and the sleeve is slidably arranged on the mounting platform; the sliding direction of the sleeve is parallel to the length direction of the longitudinal reinforcing steel bar, a polishing assembly and a tapping assembly are arranged in the sleeve, the polishing assembly is used for polishing cement on the longitudinal reinforcing steel bar, and the tapping assembly is used for restoring a threaded section on the longitudinal reinforcing steel bar. The effect of improving the stability of the assembled pier is achieved.
本申请涉及一种顶升调坡桥梁预制装配式桥墩及其施工方法,属于桥梁维修加固技术领域,包括安装平台,所述安装平台上设置有套筒,所述套筒用于套接拆除桥墩的纵向钢筋,所述套筒滑动设置在安装平台上,所述套筒的滑动方向平行于纵向钢筋的长度方向,所述套筒内设置有打磨组件和攻丝组件,所述打磨组件用于磨平纵向钢筋上的水泥,所述攻丝组件用于还原纵向钢筋上的螺纹段。本申请具有提高装配桥墩稳定性的效果。
Jacking slope adjusting bridge prefabricated assembly type pier and construction method thereof
The invention relates to a jacking slope-adjusting bridge prefabricated assembly type pier and a construction method thereof, and belongs to the technical field of bridge maintenance and reinforcement, the jacking slope-adjusting bridge prefabricated assembly type pier comprises a mounting platform, a sleeve is arranged on the mounting platform, the sleeve is used for being connected with a longitudinal steel bar for dismantling the pier in a sleeving mode, and the sleeve is slidably arranged on the mounting platform; the sliding direction of the sleeve is parallel to the length direction of the longitudinal reinforcing steel bar, a polishing assembly and a tapping assembly are arranged in the sleeve, the polishing assembly is used for polishing cement on the longitudinal reinforcing steel bar, and the tapping assembly is used for restoring a threaded section on the longitudinal reinforcing steel bar. The effect of improving the stability of the assembled pier is achieved.
本申请涉及一种顶升调坡桥梁预制装配式桥墩及其施工方法,属于桥梁维修加固技术领域,包括安装平台,所述安装平台上设置有套筒,所述套筒用于套接拆除桥墩的纵向钢筋,所述套筒滑动设置在安装平台上,所述套筒的滑动方向平行于纵向钢筋的长度方向,所述套筒内设置有打磨组件和攻丝组件,所述打磨组件用于磨平纵向钢筋上的水泥,所述攻丝组件用于还原纵向钢筋上的螺纹段。本申请具有提高装配桥墩稳定性的效果。
Jacking slope adjusting bridge prefabricated assembly type pier and construction method thereof
一种顶升调坡桥梁预制装配式桥墩及其施工方法
CHEN GANG (author) / TAN YUANLONG (author)
2024-12-17
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Jacking type construction method for segment prefabricated assembled pier column
European Patent Office | 2023
|Prefabricated bridge pier and construction method thereof
European Patent Office | 2023
|Prefabricated bridge pier and construction method thereof
European Patent Office | 2021
|WALKING-TYPE BRIDGE THIN-WALL PIER HIGH-PIER JACKING FORMWORK AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2023
|Bridge thin-wall high-pier walking type jacking formwork and construction method thereof
European Patent Office | 2022
|