A platform for research: civil engineering, architecture and urbanism
Combined aluminum plate curtain wall
The invention belongs to the technical field of curtain walls, and discloses a combined aluminum plate curtain wall which comprises an embedded part, a keel is installed on the front face of the embedded part through bolts, corner connectors are arranged on the two sides of the keel, and cross beams are arranged on the two sides of the keel. By matching with elastic compression of a spring in the auxiliary assembly component, the fireproof heat-preservation component can be assembled in advance outside a curtain wall assembly site, and can be integrally transported together with a plurality of groups of structures during transportation, so that independent transportation treatment and arrangement fixation of each component in the fireproof heat-preservation component are reduced; the aluminum plate assembly is aligned to the space between the cross beams, rapid sleeving assembly is achieved, meanwhile, synchronous positioning assembly of the fireproof heat preservation assembly and the aluminum plate assembly is completed, fixing treatment of the fireproof heat preservation assembly is synchronously achieved while fixing treatment of the aluminum plate assembly is achieved, the actual assembly operation time is greatly saved, and the production efficiency is improved. And the difficulty and risk of high-altitude assembly are reduced, and actual aluminum plate curtain wall construction operation is convenient, fast and efficient.
本发明属于幕墙技术领域,且公开了一种组合式铝板幕墙,包括预埋件,所述预埋件的正面通过螺栓安装有龙骨,所述龙骨的两侧设有角码,所述龙骨的两侧设有横梁。本发明通过配合辅助装配组件中的弹簧的弹性压缩,可在幕墙装配现场外进行事先组装,并在运输时连同多组结构进行整体运输,减少防火保温组件中各个部件的单独运输处理和布置固定,且在组合式装配时,通过将铝板组件对齐横梁之间的空间,实现快速套设装配,同时完成防火保温组件和铝板组件的同步定位装配,并在实现铝板组件的固定处理的同时,同步实现防火保温组件的固定处理,大大节约了实际装配操作时间,降低高空装配的难度和风险,实际铝板幕墙施工操作便捷高效。
Combined aluminum plate curtain wall
The invention belongs to the technical field of curtain walls, and discloses a combined aluminum plate curtain wall which comprises an embedded part, a keel is installed on the front face of the embedded part through bolts, corner connectors are arranged on the two sides of the keel, and cross beams are arranged on the two sides of the keel. By matching with elastic compression of a spring in the auxiliary assembly component, the fireproof heat-preservation component can be assembled in advance outside a curtain wall assembly site, and can be integrally transported together with a plurality of groups of structures during transportation, so that independent transportation treatment and arrangement fixation of each component in the fireproof heat-preservation component are reduced; the aluminum plate assembly is aligned to the space between the cross beams, rapid sleeving assembly is achieved, meanwhile, synchronous positioning assembly of the fireproof heat preservation assembly and the aluminum plate assembly is completed, fixing treatment of the fireproof heat preservation assembly is synchronously achieved while fixing treatment of the aluminum plate assembly is achieved, the actual assembly operation time is greatly saved, and the production efficiency is improved. And the difficulty and risk of high-altitude assembly are reduced, and actual aluminum plate curtain wall construction operation is convenient, fast and efficient.
本发明属于幕墙技术领域,且公开了一种组合式铝板幕墙,包括预埋件,所述预埋件的正面通过螺栓安装有龙骨,所述龙骨的两侧设有角码,所述龙骨的两侧设有横梁。本发明通过配合辅助装配组件中的弹簧的弹性压缩,可在幕墙装配现场外进行事先组装,并在运输时连同多组结构进行整体运输,减少防火保温组件中各个部件的单独运输处理和布置固定,且在组合式装配时,通过将铝板组件对齐横梁之间的空间,实现快速套设装配,同时完成防火保温组件和铝板组件的同步定位装配,并在实现铝板组件的固定处理的同时,同步实现防火保温组件的固定处理,大大节约了实际装配操作时间,降低高空装配的难度和风险,实际铝板幕墙施工操作便捷高效。
Combined aluminum plate curtain wall
一种组合式铝板幕墙
KIM EUI-YOUNG (author) / WU XIAO (author) / REN YONGHONG (author) / CHEN ZHEN (author)
2024-12-17
Patent
Electronic Resource
Chinese