Pitched roof hanging basket installation method
The invention discloses a pitched roof hanging basket mounting method, and particularly relates to the technical field of hanging basket mounting, which comprises the steps of S1, planning a hanging basket mounting position, S2, when the tail end of a steel wire rope is reliably connected with a structure, S3, mounting and debugging a suspension platform, S4, when the steel wire rope is fixed and a safety rope is mounted, S5, electrifying and checking, S6, when a hanging basket load test and detection are carried out, and S7, continuous monitoring measures are taken. The model of the hanging basket equipment is determined according to the calculated load in the operation process, the model and size data of the steel wire rope of each node are checked, the detection data are compared with background management data for multiple times, and the data are checked and compared for multiple times through each node, so that the installation of the hanging basket on the pitched roof can be accurately known according to specified requirements; installation precision is greatly improved, and installation quality is improved.
本发明公开了坡屋面吊篮安装方法,具体涉及吊篮安装技术领域,包括S1、规划吊篮安放位置,S2、钢丝绳末端与结构可靠连接时,S3、悬吊平台的安装、调试时,S4、钢丝绳固定、安全绳的安装时,S5、通电、检查,S6、吊篮荷载试验及检测时,S7、持续监测监控措施时。本发明根据计算所得到的作业过程中的荷载确定吊篮设备型号,检查各个节点钢丝绳的型号,尺寸数据,检测数据与后台管理数据比对多次,经过各个节点对数据实现多次核对比对,可以精确知晓按照指定要求进行坡屋面吊篮安装,安装精度大幅度提高,提高安装质量。
Pitched roof hanging basket installation method
The invention discloses a pitched roof hanging basket mounting method, and particularly relates to the technical field of hanging basket mounting, which comprises the steps of S1, planning a hanging basket mounting position, S2, when the tail end of a steel wire rope is reliably connected with a structure, S3, mounting and debugging a suspension platform, S4, when the steel wire rope is fixed and a safety rope is mounted, S5, electrifying and checking, S6, when a hanging basket load test and detection are carried out, and S7, continuous monitoring measures are taken. The model of the hanging basket equipment is determined according to the calculated load in the operation process, the model and size data of the steel wire rope of each node are checked, the detection data are compared with background management data for multiple times, and the data are checked and compared for multiple times through each node, so that the installation of the hanging basket on the pitched roof can be accurately known according to specified requirements; installation precision is greatly improved, and installation quality is improved.
本发明公开了坡屋面吊篮安装方法,具体涉及吊篮安装技术领域,包括S1、规划吊篮安放位置,S2、钢丝绳末端与结构可靠连接时,S3、悬吊平台的安装、调试时,S4、钢丝绳固定、安全绳的安装时,S5、通电、检查,S6、吊篮荷载试验及检测时,S7、持续监测监控措施时。本发明根据计算所得到的作业过程中的荷载确定吊篮设备型号,检查各个节点钢丝绳的型号,尺寸数据,检测数据与后台管理数据比对多次,经过各个节点对数据实现多次核对比对,可以精确知晓按照指定要求进行坡屋面吊篮安装,安装精度大幅度提高,提高安装质量。
Pitched roof hanging basket installation method
坡屋面吊篮安装方法
LI TIAN (author) / YAN GUANGLEI (author) / ZHANG QIAN (author) / LIU JUNQI (author) / WANG ZHIGUO (author) / XIE RUNDONG (author) / SUN ZHE (author)
2024-12-17
Patent
Electronic Resource
Chinese
Special-shaped pitched roof hanging basket installation construction structure
European Patent Office | 2023
|Position-adjustable hanging basket suspension bracket for pitched roof
European Patent Office | 2024
|European Patent Office | 2023
|Balance-weight-free hanging basket erecting method suitable for open type pitched roof building
European Patent Office | 2023
|European Patent Office | 2024
|