A platform for research: civil engineering, architecture and urbanism
Shear wall formwork system with single or continuous arched door opening and construction method of shear wall formwork system
The invention discloses a shear wall formwork system with a single or continuous arched door opening and a construction method of the shear wall formwork system. The shear wall formwork system with the continuous arched door opening comprises vertical supporting columns located on the two sides of each arched door opening of a shear wall. The arch support is connected between the two vertical supporting columns and is matched with the camber of an arch door opening, the arch crown bottom die is connected to the arch support, the door opening wall side dies are connected with the arch crown bottom die through split bolts, the door opening wall side dies are connected with the arch crown bottom die, hole-free wall side dies are arranged between the adjacent door opening wall side dies, and the hole-free wall side dies are connected with the arch crown bottom die. And the wall end side molds are arranged between the outermost wall side molds at the two ends. The method has the advantages that the space below the arched door opening is not occupied, the disassembly and assembly efficiency is high, the construction period is short, and the disassembly and assembly procedure is simple.
本发明公开一种具有单个或者连续拱形门洞的剪力墙支模体系及其施工方法,该连续拱形门洞的剪力墙支模体系包括位于剪力墙的每个拱形门洞两侧的竖向支撑柱,连接在两根竖向支撑柱之间且与拱形门洞的起拱度相匹配的拱形支撑,连接在所述拱形支撑上的拱顶底模,所述拱顶底模通过对拉螺栓连接的门洞墙侧模,所述门洞墙侧模与拱顶底模连接,相邻门洞墙侧模之间设置有无洞墙侧模,位于两端最外侧墙侧模之间设置的墙端侧模。本发明具有不占用拱形门洞下方空间、拆装效率高、工期短、拆装工序简单的优点。
Shear wall formwork system with single or continuous arched door opening and construction method of shear wall formwork system
The invention discloses a shear wall formwork system with a single or continuous arched door opening and a construction method of the shear wall formwork system. The shear wall formwork system with the continuous arched door opening comprises vertical supporting columns located on the two sides of each arched door opening of a shear wall. The arch support is connected between the two vertical supporting columns and is matched with the camber of an arch door opening, the arch crown bottom die is connected to the arch support, the door opening wall side dies are connected with the arch crown bottom die through split bolts, the door opening wall side dies are connected with the arch crown bottom die, hole-free wall side dies are arranged between the adjacent door opening wall side dies, and the hole-free wall side dies are connected with the arch crown bottom die. And the wall end side molds are arranged between the outermost wall side molds at the two ends. The method has the advantages that the space below the arched door opening is not occupied, the disassembly and assembly efficiency is high, the construction period is short, and the disassembly and assembly procedure is simple.
本发明公开一种具有单个或者连续拱形门洞的剪力墙支模体系及其施工方法,该连续拱形门洞的剪力墙支模体系包括位于剪力墙的每个拱形门洞两侧的竖向支撑柱,连接在两根竖向支撑柱之间且与拱形门洞的起拱度相匹配的拱形支撑,连接在所述拱形支撑上的拱顶底模,所述拱顶底模通过对拉螺栓连接的门洞墙侧模,所述门洞墙侧模与拱顶底模连接,相邻门洞墙侧模之间设置有无洞墙侧模,位于两端最外侧墙侧模之间设置的墙端侧模。本发明具有不占用拱形门洞下方空间、拆装效率高、工期短、拆装工序简单的优点。
Shear wall formwork system with single or continuous arched door opening and construction method of shear wall formwork system
一种具有单个或者连续拱形门洞的剪力墙支模体系及其施工方法
LI JIONG (author) / WANG WEI (author) / CAI JUNJUN (author) / CHEN XIANLIANG (author) / LIU ZITIAN (author) / WU GUANGYU (author) / ZHANG GUANGYAO (author) / HAO XIAOYUN (author)
2024-12-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste