Waterproof and heat preservation integrated construction process for roof post-grouting
The invention discloses a roof post-grouting waterproof and thermal insulation integrated construction process which comprises the following steps: S1, arranging the positions of holes on the basis of original roof construction; s2, after hole position planning is completed through a drilling machine, accurate drilling operation is conducted through drilling equipment meeting the standard; s3, special grouting machine equipment and grouting liquid are adopted for conducting pressure grouting on the pre-drilled hole; the invention relates to the technical field of roof waterproofing and heat preservation, an original roof structure does not need to be dismantled, construction is directly carried out on an original foundation, the rebuilding cost is reduced, and the construction period is shortened. By means of the grouting mode, the leaked roof structure is integrally combined, the waterproof and heat preservation integrated effect is achieved, the service life of the roof is further prolonged, the comfort degree of the roof is further improved, and therefore construction efficiency and economic benefits are greatly improved, and damage to the original structure of the roof is reduced.
本发明公开了一种屋面后注浆的防水保温一体化施工工艺,包括以下步骤:S1、在原有屋面施工的基础上,布置孔洞的位置;S2、使用钻孔机完成孔洞位置规划后,使用符合标准的钻孔设备进行精准钻孔操作;S3、采用专用注浆机设备及注浆液向预先钻孔的孔洞进行压力注浆;本发明涉及屋面防水保温技术领域,本发明无需拆除原有屋面构造,直接在原有基础上进行施工,既降低了翻修成本,又缩短了施工周期。通过注浆的方式,使渗漏的屋面构造得到整体结合,实现了防水与保温一体化效果,进一步提高了屋面的使用寿命和舒适度,从而大大提升了施工效率和经济效益,减少了对屋面原有结构的破坏。
Waterproof and heat preservation integrated construction process for roof post-grouting
The invention discloses a roof post-grouting waterproof and thermal insulation integrated construction process which comprises the following steps: S1, arranging the positions of holes on the basis of original roof construction; s2, after hole position planning is completed through a drilling machine, accurate drilling operation is conducted through drilling equipment meeting the standard; s3, special grouting machine equipment and grouting liquid are adopted for conducting pressure grouting on the pre-drilled hole; the invention relates to the technical field of roof waterproofing and heat preservation, an original roof structure does not need to be dismantled, construction is directly carried out on an original foundation, the rebuilding cost is reduced, and the construction period is shortened. By means of the grouting mode, the leaked roof structure is integrally combined, the waterproof and heat preservation integrated effect is achieved, the service life of the roof is further prolonged, the comfort degree of the roof is further improved, and therefore construction efficiency and economic benefits are greatly improved, and damage to the original structure of the roof is reduced.
本发明公开了一种屋面后注浆的防水保温一体化施工工艺,包括以下步骤:S1、在原有屋面施工的基础上,布置孔洞的位置;S2、使用钻孔机完成孔洞位置规划后,使用符合标准的钻孔设备进行精准钻孔操作;S3、采用专用注浆机设备及注浆液向预先钻孔的孔洞进行压力注浆;本发明涉及屋面防水保温技术领域,本发明无需拆除原有屋面构造,直接在原有基础上进行施工,既降低了翻修成本,又缩短了施工周期。通过注浆的方式,使渗漏的屋面构造得到整体结合,实现了防水与保温一体化效果,进一步提高了屋面的使用寿命和舒适度,从而大大提升了施工效率和经济效益,减少了对屋面原有结构的破坏。
Waterproof and heat preservation integrated construction process for roof post-grouting
一种屋面后注浆的防水保温一体化施工工艺
WU JUN (author) / LI DONGFENG (author) / JIN YAN (author)
2024-12-17
Patent
Electronic Resource
Chinese
Roof waterproof and heat preservation integrated construction method
European Patent Office | 2024
|Heat-preservation waterproof roof construction structure, waterproof roof and construction method
European Patent Office | 2021
|Roof deformation joint waterproof heat-preservation construction process
European Patent Office | 2021
|Roof waterproof heat preservation protection integrated structure and construction technology
European Patent Office | 2024
|