The invention discloses a dustproof building fence for civil engineering construction and belongs to the technical field of building construction.A fixed head pile is arranged to play a role of a first stand column structure, the head pile can be fixed to the ground through anchoring nails, after the head pile is fixed, a tail pile is pulled, plastic cloth in the tail pile is pulled out of a winding roller to form a blocking face, and at the moment, the plastic cloth is pulled out of the winding roller to form the blocking face; the first half pile and the second half pile are clamped at the tail end of the retaining face, the closed inserting pile is inserted into the ground, and then a temporary fixing and turning fixing point of the plastic cloth can be formed. According to the scheme, the head pile and the tail pile are arranged, and the inserting pile is clamped between the head pile and the tail pile, so that the mounted enclosure structure and the plastic cloth are of a continuous retaining face structure, mounting is easy and convenient, and the sealing performance is good; and by arranging the inserting piles, middle-section supporting can be provided for the plastic cloth, the situation that the plastic cloth collapses under the action of gravity is avoided, the inserting piles can also serve as turning anchor points of the fence, the fence is distributed in a winding mode, and the structure is high in continuity and convenient to carry and disassemble and assemble.
本发明公开了一种土木工程施工用防尘建筑围挡,属于建筑施工技术领域,通过设置固定的首桩,起到第一个立柱结构的作用,首桩可通过锚固钉固定在地面,固定好首桩后,牵引尾桩,尾桩内的塑胶布从卷辊抽出,成为一块挡面,此时,将第一半桩和第二半桩夹持挡面末端,并将合拢的插桩插入地面,即可成为塑胶布的临时固定和转折固定点,此方案通过设置首桩和尾桩,中间夹设插桩,使安装完成的围挡结构,塑胶布呈连续的挡面结构,安装简便,封闭性好,并且通过设置插桩,可以给塑胶布提供中段支撑,避免塑胶布在重力的作用下导致下塌,插桩也能作为围挡的转折锚点,使围挡蜿蜒分布,此结构连续性强,搬运方便,拆装便捷。
The invention discloses a dustproof building fence for civil engineering construction and belongs to the technical field of building construction.A fixed head pile is arranged to play a role of a first stand column structure, the head pile can be fixed to the ground through anchoring nails, after the head pile is fixed, a tail pile is pulled, plastic cloth in the tail pile is pulled out of a winding roller to form a blocking face, and at the moment, the plastic cloth is pulled out of the winding roller to form the blocking face; the first half pile and the second half pile are clamped at the tail end of the retaining face, the closed inserting pile is inserted into the ground, and then a temporary fixing and turning fixing point of the plastic cloth can be formed. According to the scheme, the head pile and the tail pile are arranged, and the inserting pile is clamped between the head pile and the tail pile, so that the mounted enclosure structure and the plastic cloth are of a continuous retaining face structure, mounting is easy and convenient, and the sealing performance is good; and by arranging the inserting piles, middle-section supporting can be provided for the plastic cloth, the situation that the plastic cloth collapses under the action of gravity is avoided, the inserting piles can also serve as turning anchor points of the fence, the fence is distributed in a winding mode, and the structure is high in continuity and convenient to carry and disassemble and assemble.
本发明公开了一种土木工程施工用防尘建筑围挡,属于建筑施工技术领域,通过设置固定的首桩,起到第一个立柱结构的作用,首桩可通过锚固钉固定在地面,固定好首桩后,牵引尾桩,尾桩内的塑胶布从卷辊抽出,成为一块挡面,此时,将第一半桩和第二半桩夹持挡面末端,并将合拢的插桩插入地面,即可成为塑胶布的临时固定和转折固定点,此方案通过设置首桩和尾桩,中间夹设插桩,使安装完成的围挡结构,塑胶布呈连续的挡面结构,安装简便,封闭性好,并且通过设置插桩,可以给塑胶布提供中段支撑,避免塑胶布在重力的作用下导致下塌,插桩也能作为围挡的转折锚点,使围挡蜿蜒分布,此结构连续性强,搬运方便,拆装便捷。
Dustproof building fence for civil engineering construction
一种土木工程施工用防尘建筑围挡
2024-12-20
Patent
Electronic Resource
Chinese
Protective fence for civil engineering building construction
European Patent Office | 2020
|