A platform for research: civil engineering, architecture and urbanism
Construction site temporary housing construction structure easy to disassemble and assemble and construction method of construction site temporary housing construction structure
The construction site temporary housing construction structure comprises a bottom room, a rotating placement structure is arranged on the long edge of one side of the top of the bottom room, the rotating placement structure extends along the side wall of the bottom room, and a top room is correspondingly fixed to the extending side of the rotating placement structure; the bottom face of the top room corresponds to the side wall of the bottom room, and a window is formed in the end wall of the top room. A sliding butt joint structure is arranged on the top surface of the bottom room; the sliding butt-joint structure is perpendicular to the rotating axis of the rotating placement structure, and the bottom face of the top room is slidably connected to the sliding butt-joint structure. One end of the rotary placement structure is meshed with a driving structure and a braking structure. The double-layer temporary house building structure has the effect that the double-layer temporary house building structure can be installed without a crane.
本申请涉及一种易拆装工地临时房建结构及其施工方法,其包括底部房间,底部房间顶部的一侧长边处设有旋转安置结构,旋转安置结构沿底部房间侧壁延伸,且旋转安置结构延伸侧上对应固定有顶部房间,且顶部房间的底面对应底部房间的侧壁设置,顶部房间端壁开设有窗口;底部房间顶面设有滑动对接结构;滑动对接结构垂直旋转安置结构的旋转轴心设置,顶部房间底面可滑动连接于滑动对接结构;旋转安置结构一端啮合连接有驱动结构和制动结构。本申请具有无需借助吊车即可安装双层的临时房建结构的效果。
Construction site temporary housing construction structure easy to disassemble and assemble and construction method of construction site temporary housing construction structure
The construction site temporary housing construction structure comprises a bottom room, a rotating placement structure is arranged on the long edge of one side of the top of the bottom room, the rotating placement structure extends along the side wall of the bottom room, and a top room is correspondingly fixed to the extending side of the rotating placement structure; the bottom face of the top room corresponds to the side wall of the bottom room, and a window is formed in the end wall of the top room. A sliding butt joint structure is arranged on the top surface of the bottom room; the sliding butt-joint structure is perpendicular to the rotating axis of the rotating placement structure, and the bottom face of the top room is slidably connected to the sliding butt-joint structure. One end of the rotary placement structure is meshed with a driving structure and a braking structure. The double-layer temporary house building structure has the effect that the double-layer temporary house building structure can be installed without a crane.
本申请涉及一种易拆装工地临时房建结构及其施工方法,其包括底部房间,底部房间顶部的一侧长边处设有旋转安置结构,旋转安置结构沿底部房间侧壁延伸,且旋转安置结构延伸侧上对应固定有顶部房间,且顶部房间的底面对应底部房间的侧壁设置,顶部房间端壁开设有窗口;底部房间顶面设有滑动对接结构;滑动对接结构垂直旋转安置结构的旋转轴心设置,顶部房间底面可滑动连接于滑动对接结构;旋转安置结构一端啮合连接有驱动结构和制动结构。本申请具有无需借助吊车即可安装双层的临时房建结构的效果。
Construction site temporary housing construction structure easy to disassemble and assemble and construction method of construction site temporary housing construction structure
一种易拆装工地临时房建结构及其施工方法
LOU AIGUO (author) / ZHAO SHIPING (author) / ZHENG JINGJING (author) / YE YANYU (author) / ZHENG JIE (author)
2024-12-24
Patent
Electronic Resource
Chinese
Temporary housing construction structure easy to disassemble
European Patent Office | 2022
|Easily-disassembled temporary housing construction structure in construction site
European Patent Office | 2015
|Construction method of fabricated temporary construction site
European Patent Office | 2024
|