A platform for research: civil engineering, architecture and urbanism
Prefabricated reinforced concrete shear wall
The invention discloses a prefabricated reinforced concrete shear wall, and relates to the technical field of constructional engineering, the prefabricated reinforced concrete shear wall comprises a shear wall body, a sleeve main body, a wallboard, a steel bar main body and a pouring hole, the bottom of the sleeve main body is provided with a grouting cavity, and the center of the interior of the grouting cavity is provided with a moving disc. According to the prefabricated reinforced concrete shear wall, in the assembly process of the shear wall body, air in the vent groove is extruded through ascending of the movable disc, so that the positioning clamping rings move synchronously and are attached to the steel bars, the assembly precision and stability are improved, and the installation accuracy is ensured. During grouting and pouring, slurry fills and extrudes the supporting blocks, connection between the movable disc and the movable plate is relieved, the second through holes are formed, clamping of the steel bars by the positioning clamping rings is automatically relieved, stress concentration is avoided, and the structural safety is improved. And meanwhile, the movable plate moves downwards to touch the trigger block, and under the cooperation of the connecting plate and the spring, the connecting plate continuously vibrates to remove bubbles after pouring is completed, so that the bubble amount of slurry is reduced, and the structural compactness and durability of the shear wall are enhanced.
本发明公开了一种预制钢筋混凝土剪力墙,涉及建筑工程技术领域,包括剪力墙体、套筒主体、墙板、钢筋主体、浇筑孔,所述套筒主体的底部开设有灌浆腔,且灌浆腔的内部中心设置有移动盘。本一种预制钢筋混凝土剪力墙,在剪力墙体装配过程中,通过移动盘的上升挤压通气槽内空气,使定位夹环同步移动并贴合钢筋,提高装配精度和稳定性,确保安装准确性。灌浆浇筑时,浆料填充挤压支撑块,解除移动盘与移动板连接并打开通孔二,自动解除定位夹环对钢筋的夹持,避免应力集中,提升结构安全性。同时,移动板下移碰触触发块,在连接板与弹簧配合下,浇筑完成后连接板连续震动除泡,降低浆料气泡量,增强剪力墙体的结构密实性和耐久性。
Prefabricated reinforced concrete shear wall
The invention discloses a prefabricated reinforced concrete shear wall, and relates to the technical field of constructional engineering, the prefabricated reinforced concrete shear wall comprises a shear wall body, a sleeve main body, a wallboard, a steel bar main body and a pouring hole, the bottom of the sleeve main body is provided with a grouting cavity, and the center of the interior of the grouting cavity is provided with a moving disc. According to the prefabricated reinforced concrete shear wall, in the assembly process of the shear wall body, air in the vent groove is extruded through ascending of the movable disc, so that the positioning clamping rings move synchronously and are attached to the steel bars, the assembly precision and stability are improved, and the installation accuracy is ensured. During grouting and pouring, slurry fills and extrudes the supporting blocks, connection between the movable disc and the movable plate is relieved, the second through holes are formed, clamping of the steel bars by the positioning clamping rings is automatically relieved, stress concentration is avoided, and the structural safety is improved. And meanwhile, the movable plate moves downwards to touch the trigger block, and under the cooperation of the connecting plate and the spring, the connecting plate continuously vibrates to remove bubbles after pouring is completed, so that the bubble amount of slurry is reduced, and the structural compactness and durability of the shear wall are enhanced.
本发明公开了一种预制钢筋混凝土剪力墙,涉及建筑工程技术领域,包括剪力墙体、套筒主体、墙板、钢筋主体、浇筑孔,所述套筒主体的底部开设有灌浆腔,且灌浆腔的内部中心设置有移动盘。本一种预制钢筋混凝土剪力墙,在剪力墙体装配过程中,通过移动盘的上升挤压通气槽内空气,使定位夹环同步移动并贴合钢筋,提高装配精度和稳定性,确保安装准确性。灌浆浇筑时,浆料填充挤压支撑块,解除移动盘与移动板连接并打开通孔二,自动解除定位夹环对钢筋的夹持,避免应力集中,提升结构安全性。同时,移动板下移碰触触发块,在连接板与弹簧配合下,浇筑完成后连接板连续震动除泡,降低浆料气泡量,增强剪力墙体的结构密实性和耐久性。
Prefabricated reinforced concrete shear wall
一种预制钢筋混凝土剪力墙
KE MINGZHONG (author) / MEI SHUCHANG (author) / XIAO FENG (author) / QIAN XIAODONG (author) / ZHU JIANFENG (author) / ZHENG FEI (author) / CHEN ZHEJIA (author)
2024-12-31
Patent
Electronic Resource
Chinese
Prefabricated reinforced concrete shear wall and construction method
European Patent Office | 2020
|Prefabricated lattice type steel-reinforced concrete composite shear wall
European Patent Office | 2022
|Prefabricated reinforced concrete shear wall component and assembly construction method
European Patent Office | 2024
|