A platform for research: civil engineering, architecture and urbanism
Steel rail replacing and laying device and construction method
The invention discloses a steel rail replacing and laying device and a construction method, and the steel rail replacing and laying device comprises a long steel rail train set arranged on a line, and the long steel rail train set is used for recycling long steel rails to be replaced on an adjacent line and laying new long steel rails on the adjacent line; and the rail welding unit is arranged on the adjacent line and is used for welding the end part of the new long steel rail with the existing steel rail. Compared with the prior art, the steel rail replacing and laying device and the construction method have the advantages that alternate interference of procedures can be reduced, construction organization difficulty can be lowered, rail replacing construction operation efficiency can be improved, driving safety risks can be lowered, and the efficiency of input equipment can be brought into full play.
本申请公开一种钢轨换铺装置以及施工方法,包括:设置在本线上的长钢轨列车组,所述长钢轨列车组用于回收邻线上的待换长钢轨,并在所述邻线上铺设新长钢轨;设置在所述邻线上的焊轨机组,所述焊轨机组用于将所述新长钢轨的端部与既有钢轨进行焊接。本申请提供的钢轨换铺装置以及施工方法,相较于现有技术而言,能够减少工序交替干扰,降低施工组织难度,能够提高换轨施工作业效率,降低行车安全风险,并能充分发挥投入设备的效能。
Steel rail replacing and laying device and construction method
The invention discloses a steel rail replacing and laying device and a construction method, and the steel rail replacing and laying device comprises a long steel rail train set arranged on a line, and the long steel rail train set is used for recycling long steel rails to be replaced on an adjacent line and laying new long steel rails on the adjacent line; and the rail welding unit is arranged on the adjacent line and is used for welding the end part of the new long steel rail with the existing steel rail. Compared with the prior art, the steel rail replacing and laying device and the construction method have the advantages that alternate interference of procedures can be reduced, construction organization difficulty can be lowered, rail replacing construction operation efficiency can be improved, driving safety risks can be lowered, and the efficiency of input equipment can be brought into full play.
本申请公开一种钢轨换铺装置以及施工方法,包括:设置在本线上的长钢轨列车组,所述长钢轨列车组用于回收邻线上的待换长钢轨,并在所述邻线上铺设新长钢轨;设置在所述邻线上的焊轨机组,所述焊轨机组用于将所述新长钢轨的端部与既有钢轨进行焊接。本申请提供的钢轨换铺装置以及施工方法,相较于现有技术而言,能够减少工序交替干扰,降低施工组织难度,能够提高换轨施工作业效率,降低行车安全风险,并能充分发挥投入设备的效能。
Steel rail replacing and laying device and construction method
一种钢轨换铺装置以及施工方法
REN JIHONG (author) / WANG CAICHENG (author) / XIE CHANGZHENG (author) / LUO LIJUN (author) / SU XINGWANG (author) / WANG JUN (author) / ZHAO HONGYANG (author) / ZHOU TAO (author) / SHEN KAILIN (author) / HE HAIBING (author)
2025-01-07
Patent
Electronic Resource
Chinese
Track large rail piece laying and replacing operation method
European Patent Office | 2023
|Rail component laying, replacing and hoisting device and operation method thereof
European Patent Office | 2022
|Extra-long subway tunnel 25m steel rail replacing and laying device and using method thereof
European Patent Office | 2020
|Steel rail welding equipment, operation method and steel rail laying construction method
European Patent Office | 2024
|