A platform for research: civil engineering, architecture and urbanism
Fabricated building used in constructional engineering
The fabricated building comprises a wall body, a mounting groove is formed in the side wall of the wall body, an inner plate is slidably connected to the inner wall of the mounting groove, a screw rod is rotatably connected to the interior of the inner plate, and a sliding plate is rotatably connected to the outer wall of the screw rod; and the two corresponding side walls of the sliding plate are each rotationally connected with a connecting plate, a locking mechanism is arranged between every two adjacent connecting plates, a first sliding groove is formed in the inner wall of the wall body, and each locking mechanism comprises a shell and is fixedly connected with the wall body in a clamped mode. According to the fabricated building used in the constructional engineering, the multiple limiting columns are clamped to the inner walls of the clamping holes, then the two locking mechanisms synchronously and mutually move by rotating the screw rods, the wall bodies can be driven to horizontally move in the process, the two wall bodies can be tightly attached together after movement is completed, the operation in the assembly process is simple, and the assembly efficiency is high. The connecting strength can be ensured, and meanwhile the assembling cost can be reduced.
本发明公开了一种用于建筑工程中的装配式建筑,装配式建筑技术领域,包括墙体,所述墙体的侧壁开设有安装槽,且安装槽的内壁滑动连接有内板,所述内板的内部转动连接有螺杆,且螺杆的外壁转动连接有滑动板,所述滑动板的相对应的两侧壁均转动连接有连接板,相近的两个所述连接板之间开设有锁定机构,所述墙体的内壁开设有第一滑槽,所述锁定机构包括壳体,与墙体进行卡接固定。本一种用于建筑工程中的装配式建筑,通过多个限位柱卡接在卡孔的内壁,之后通过转动螺杆使两个锁定机构同步相互移动,过程中会带动墙体进行水平移动,在移动完成后,两个墙体会紧紧贴合在一起,装配过程操作简单,能够确保连接的强度,同时能够减少装配成本。
Fabricated building used in constructional engineering
The fabricated building comprises a wall body, a mounting groove is formed in the side wall of the wall body, an inner plate is slidably connected to the inner wall of the mounting groove, a screw rod is rotatably connected to the interior of the inner plate, and a sliding plate is rotatably connected to the outer wall of the screw rod; and the two corresponding side walls of the sliding plate are each rotationally connected with a connecting plate, a locking mechanism is arranged between every two adjacent connecting plates, a first sliding groove is formed in the inner wall of the wall body, and each locking mechanism comprises a shell and is fixedly connected with the wall body in a clamped mode. According to the fabricated building used in the constructional engineering, the multiple limiting columns are clamped to the inner walls of the clamping holes, then the two locking mechanisms synchronously and mutually move by rotating the screw rods, the wall bodies can be driven to horizontally move in the process, the two wall bodies can be tightly attached together after movement is completed, the operation in the assembly process is simple, and the assembly efficiency is high. The connecting strength can be ensured, and meanwhile the assembling cost can be reduced.
本发明公开了一种用于建筑工程中的装配式建筑,装配式建筑技术领域,包括墙体,所述墙体的侧壁开设有安装槽,且安装槽的内壁滑动连接有内板,所述内板的内部转动连接有螺杆,且螺杆的外壁转动连接有滑动板,所述滑动板的相对应的两侧壁均转动连接有连接板,相近的两个所述连接板之间开设有锁定机构,所述墙体的内壁开设有第一滑槽,所述锁定机构包括壳体,与墙体进行卡接固定。本一种用于建筑工程中的装配式建筑,通过多个限位柱卡接在卡孔的内壁,之后通过转动螺杆使两个锁定机构同步相互移动,过程中会带动墙体进行水平移动,在移动完成后,两个墙体会紧紧贴合在一起,装配过程操作简单,能够确保连接的强度,同时能够减少装配成本。
Fabricated building used in constructional engineering
一种用于建筑工程中的装配式建筑
HAN CHAO (author) / ZHANG ZHENGYI (author) / GU WENHONG (author) / SUN XUN (author) / YANG ZHONGSHUN (author) / WANG FENG (author) / ZHU XIUYAN (author)
2025-01-07
Patent
Electronic Resource
Chinese
Fabricated building supporting seat used in constructional engineering
European Patent Office | 2020
|Fabricated building supporting seat for constructional engineering
European Patent Office | 2023
|Steel structure fabricated building for constructional engineering
European Patent Office | 2023
|Fabricated building supporting device for constructional engineering
European Patent Office | 2024
|