Ultra-high performance geopolymer concrete permanent formwork filled with SFCB concrete prefabricated pipe pile and preparation method of ultra-high performance geopolymer concrete permanent formwork filled with SFCB concrete prefabricated pipe pile
The invention provides a prefabricated pipe pile with an ultrahigh-performance geopolymer concrete permanent formwork filled with SFCB concrete and a preparation method of the prefabricated pipe pile. The pipe pile is characterized in that the ultrahigh-performance geopolymer concrete permanent formwork serves as an outer pipe; the ultrahigh-performance geopolymer concrete permanent formwork serves as an inner pipe, and the outer pipe is arranged outside the inner pipe in a sleeving mode. The composite material grids are respectively arranged in the middle positions of the outer pipe and the inner pipe; the common concrete is poured between the outer pipe and the inner pipe; the SFCB straight bars are arranged in the common concrete; and the FRP spiral stirrups surround the outer sides of the SFCB straight ribs. The pipe pile is good in durability and anti-seismic toughness and has the advantages of being environmentally friendly and low in cost.
本发明提供一种超高性能地聚物混凝土永久模壳内填SFCB混凝土预制管桩及其制备方法,管桩包括:超高性能地聚物混凝土永久模壳作为外管;超高性能地聚物混凝土永久模壳作为内管,外管套设在内管的外部;复合材料网格,分别配置在外管和内管的中间位置;普通混凝土,浇筑在外管和内管之间;SFCB直筋,布设在普通混凝土中;及FRP螺旋箍筋,环绕在SFCB直筋的外侧。本发明的管桩耐久性和抗震韧性好,并兼具环保和低成本的优点。
Ultra-high performance geopolymer concrete permanent formwork filled with SFCB concrete prefabricated pipe pile and preparation method of ultra-high performance geopolymer concrete permanent formwork filled with SFCB concrete prefabricated pipe pile
The invention provides a prefabricated pipe pile with an ultrahigh-performance geopolymer concrete permanent formwork filled with SFCB concrete and a preparation method of the prefabricated pipe pile. The pipe pile is characterized in that the ultrahigh-performance geopolymer concrete permanent formwork serves as an outer pipe; the ultrahigh-performance geopolymer concrete permanent formwork serves as an inner pipe, and the outer pipe is arranged outside the inner pipe in a sleeving mode. The composite material grids are respectively arranged in the middle positions of the outer pipe and the inner pipe; the common concrete is poured between the outer pipe and the inner pipe; the SFCB straight bars are arranged in the common concrete; and the FRP spiral stirrups surround the outer sides of the SFCB straight ribs. The pipe pile is good in durability and anti-seismic toughness and has the advantages of being environmentally friendly and low in cost.
本发明提供一种超高性能地聚物混凝土永久模壳内填SFCB混凝土预制管桩及其制备方法,管桩包括:超高性能地聚物混凝土永久模壳作为外管;超高性能地聚物混凝土永久模壳作为内管,外管套设在内管的外部;复合材料网格,分别配置在外管和内管的中间位置;普通混凝土,浇筑在外管和内管之间;SFCB直筋,布设在普通混凝土中;及FRP螺旋箍筋,环绕在SFCB直筋的外侧。本发明的管桩耐久性和抗震韧性好,并兼具环保和低成本的优点。
Ultra-high performance geopolymer concrete permanent formwork filled with SFCB concrete prefabricated pipe pile and preparation method of ultra-high performance geopolymer concrete permanent formwork filled with SFCB concrete prefabricated pipe pile
一种超高性能地聚物混凝土永久模壳内填SFCB混凝土预制管桩及其制备方法
ZHANG QING (author) / TANG YONGHUI (author) / CHENG DIANHU (author) / YU BIN (author) / DING LINING (author) / LIU SHUI (author)
2025-01-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
European Patent Office | 2023
|Unreinforced ultra-high performance concrete prefabricated pipe pile and construction method thereof
European Patent Office | 2020
|