A platform for research: civil engineering, architecture and urbanism
Anti-sliding construction method and tool for unbalance loading steel cofferdam
The invention relates to the technical field of steel cofferdam construction, in particular to an unbalance loading steel cofferdam anti-sliding construction method and tool. The construction method comprises the following steps: S1, surveying and setting out; s2, a notch is excavated; s3, fixing the steel cofferdam; the steel cofferdam can be effectively prevented from sliding on a riverbed, so that the stability of the whole structure is improved; the tool comprises a tool body, and the tool body comprises a plurality of anchoring piles and a connecting frame. The connecting frame comprises a first mounting rod and a second mounting rod; a connecting assembly is arranged between the first mounting rod and the second mounting rod; and the anti-overturning capacity of the steel cofferdam can be further improved.
本发明涉及钢围堰施工技术领域,具体地说,涉及一种偏载钢围堰抗滑移施工工法及工装。工法包括S1、测量放样;S2、槽口开挖;S3、钢围堰固定;能够有效防止钢围堰在河床上的滑移,从而提高整体结构的稳定性;工装包括工装主体,工装主体包括多个锚固桩,以及连接架;连接架包括第一安装杆,以及第二安装杆;第一安装杆与第二安装杆之间设有连接组件;能够进一步提升了钢围堰的抗倾覆能力。
Anti-sliding construction method and tool for unbalance loading steel cofferdam
The invention relates to the technical field of steel cofferdam construction, in particular to an unbalance loading steel cofferdam anti-sliding construction method and tool. The construction method comprises the following steps: S1, surveying and setting out; s2, a notch is excavated; s3, fixing the steel cofferdam; the steel cofferdam can be effectively prevented from sliding on a riverbed, so that the stability of the whole structure is improved; the tool comprises a tool body, and the tool body comprises a plurality of anchoring piles and a connecting frame. The connecting frame comprises a first mounting rod and a second mounting rod; a connecting assembly is arranged between the first mounting rod and the second mounting rod; and the anti-overturning capacity of the steel cofferdam can be further improved.
本发明涉及钢围堰施工技术领域,具体地说,涉及一种偏载钢围堰抗滑移施工工法及工装。工法包括S1、测量放样;S2、槽口开挖;S3、钢围堰固定;能够有效防止钢围堰在河床上的滑移,从而提高整体结构的稳定性;工装包括工装主体,工装主体包括多个锚固桩,以及连接架;连接架包括第一安装杆,以及第二安装杆;第一安装杆与第二安装杆之间设有连接组件;能够进一步提升了钢围堰的抗倾覆能力。
Anti-sliding construction method and tool for unbalance loading steel cofferdam
一种偏载钢围堰抗滑移施工工法及工装
DING RUI (author) / YANG LIYANG (author) / ZHU YU (author) / CHANG XIANHAI (author) / ZHAO YU (author) / ZHU JUNCHEN (author) / YANG QINDONG (author)
2025-01-17
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|Cofferdam steel pipe pile and cofferdam closure deviation correction construction method
European Patent Office | 2021
|Anti-floating and anti-sinking steel casing, cofferdam and construction method
European Patent Office | 2021
|