A platform for research: civil engineering, architecture and urbanism
Portable modular bridge
The invention discloses a portable modular bridge, which belongs to the field of emergency bridges and comprises bridge span modules, connecting rod modules, reinforcing rod modules, long-strip clamping grooves, holes, first buckles, second buckles and connecting joints. The holes are formed in the two vertical sides of the bridge span modules, the connecting rod modules penetrate through the holes to connect the two or more bridge span modules, long-strip-shaped clamping grooves are formed in the two ends of the bridge head of each bridge span module, first buckles are arranged at the two ends of each reinforcing rod module, and the reinforcing rod modules are connected with the long-strip-shaped clamping grooves in a matched mode through the first buckles. Second buckles are arranged at the ends of the bridge span modules, the heads and the tails of the bridge span modules in the length direction are connected through the second buckles, the bridge span modules are transversely connected through connecting joints in the width direction, and the bridge span modules and the connecting rod modules are in a detached state in the carrying process so as to reduce the transportation size. According to the invention, the generalization level is high, and the modular expansion of the length and width dimensions and the bearing capacity and the reduction of the transportation volume can be realized.
本发明公开了一种便携式模块化桥,属于应急桥梁领域,包括桥跨模块、连接杆模块、加强杆模块、长条卡槽、孔、第一卡扣、第二卡扣、连接接头;所述孔设置在桥跨模块竖向两侧,所述连接杆模块穿过孔将两个以上桥跨模块连接,所述桥跨模块桥头两端内部设有长条卡槽,所述加强杆模块两端设置有第一卡扣,所述加强杆模块通过第一卡扣与长条卡槽配合连接,所述桥跨模块端头设置第二卡扣,所述桥跨模块长度方向首尾之间通过第二卡扣连接,所述桥跨模块宽度方向横向之间通过连接接头连接,桥跨模块和连接杆模块在运载过程中处于拆卸状态以减小运输体积。本发明通用化水平高,能够实现长宽尺寸和承载能力的模块化拓展以及运输体积的减小。
Portable modular bridge
The invention discloses a portable modular bridge, which belongs to the field of emergency bridges and comprises bridge span modules, connecting rod modules, reinforcing rod modules, long-strip clamping grooves, holes, first buckles, second buckles and connecting joints. The holes are formed in the two vertical sides of the bridge span modules, the connecting rod modules penetrate through the holes to connect the two or more bridge span modules, long-strip-shaped clamping grooves are formed in the two ends of the bridge head of each bridge span module, first buckles are arranged at the two ends of each reinforcing rod module, and the reinforcing rod modules are connected with the long-strip-shaped clamping grooves in a matched mode through the first buckles. Second buckles are arranged at the ends of the bridge span modules, the heads and the tails of the bridge span modules in the length direction are connected through the second buckles, the bridge span modules are transversely connected through connecting joints in the width direction, and the bridge span modules and the connecting rod modules are in a detached state in the carrying process so as to reduce the transportation size. According to the invention, the generalization level is high, and the modular expansion of the length and width dimensions and the bearing capacity and the reduction of the transportation volume can be realized.
本发明公开了一种便携式模块化桥,属于应急桥梁领域,包括桥跨模块、连接杆模块、加强杆模块、长条卡槽、孔、第一卡扣、第二卡扣、连接接头;所述孔设置在桥跨模块竖向两侧,所述连接杆模块穿过孔将两个以上桥跨模块连接,所述桥跨模块桥头两端内部设有长条卡槽,所述加强杆模块两端设置有第一卡扣,所述加强杆模块通过第一卡扣与长条卡槽配合连接,所述桥跨模块端头设置第二卡扣,所述桥跨模块长度方向首尾之间通过第二卡扣连接,所述桥跨模块宽度方向横向之间通过连接接头连接,桥跨模块和连接杆模块在运载过程中处于拆卸状态以减小运输体积。本发明通用化水平高,能够实现长宽尺寸和承载能力的模块化拓展以及运输体积的减小。
Portable modular bridge
一种便携式模块化桥
CHEN WEI (author) / ZHU PENGCHENG (author) / CHENG YING (author) / DING YONG (author) / ZHU RENGUI (author) / XU RAN (author) / HONG HUANGJIE (author) / ZHANG YING (author) / HUANG TAO (author) / SUN YANQING (author)
2025-01-21
Patent
Electronic Resource
Chinese
MODULAR BRIDGE, MODULAR COMPONENT AND METHOD FOR CONSTRUCTING MODULAR BRIDGE
European Patent Office | 2022
|