House outer wall integral heat preservation construction process
The invention discloses an integral heat preservation construction process for a house outer wall, which belongs to the technical field of building construction and comprises the following steps: S1, finishing construction of an outer wall main body; s2, leveling is conducted through a metal component and a keel structure; s3, damp-proof treatment is conducted on the bottom of the outer wall body; s4, an anti-falling cement integrated cover plate is installed on the outer side of the wall face, and a gap exists between the anti-falling cement integrated cover plate and the wall face; s5, a heat preservation sealing material is arranged in the gap; and S6, a decorative surface layer is arranged on the outer side of the anti-falling cement integrated cover plate. According to the technical scheme, leveling is not needed after the main body is completed, the construction efficiency is improved on the premise that the construction quality is guaranteed, construction operation of the heat preservation layer is easy and convenient, the heat preservation effect is good, and the attractiveness is high.
本发明公开了一种房屋外墙整体保温施工工艺,属于建筑施工技术领域,包括以下步骤:S1:外墙主体建设完成;S2:采用金属构件和龙骨结构进行调平;S3:对所述外墙主体底部进行防潮处理;S4:在墙面外侧安装防脱落水泥一体盖板,所述防脱落水泥一体盖板与墙面之间存在缝隙;S5:所述缝隙内设置保温密封材料;S6:防脱落水泥一体盖板外侧设置装饰面层。本发明示例的技术方案,主体完成后无需找平,在保证施工质量的前提下提高了施工效率,保温层施工操作简便,且保温效果好,美观度高。
House outer wall integral heat preservation construction process
The invention discloses an integral heat preservation construction process for a house outer wall, which belongs to the technical field of building construction and comprises the following steps: S1, finishing construction of an outer wall main body; s2, leveling is conducted through a metal component and a keel structure; s3, damp-proof treatment is conducted on the bottom of the outer wall body; s4, an anti-falling cement integrated cover plate is installed on the outer side of the wall face, and a gap exists between the anti-falling cement integrated cover plate and the wall face; s5, a heat preservation sealing material is arranged in the gap; and S6, a decorative surface layer is arranged on the outer side of the anti-falling cement integrated cover plate. According to the technical scheme, leveling is not needed after the main body is completed, the construction efficiency is improved on the premise that the construction quality is guaranteed, construction operation of the heat preservation layer is easy and convenient, the heat preservation effect is good, and the attractiveness is high.
本发明公开了一种房屋外墙整体保温施工工艺,属于建筑施工技术领域,包括以下步骤:S1:外墙主体建设完成;S2:采用金属构件和龙骨结构进行调平;S3:对所述外墙主体底部进行防潮处理;S4:在墙面外侧安装防脱落水泥一体盖板,所述防脱落水泥一体盖板与墙面之间存在缝隙;S5:所述缝隙内设置保温密封材料;S6:防脱落水泥一体盖板外侧设置装饰面层。本发明示例的技术方案,主体完成后无需找平,在保证施工质量的前提下提高了施工效率,保温层施工操作简便,且保温效果好,美观度高。
House outer wall integral heat preservation construction process
一种房屋外墙整体保温施工工艺
GAO JINIAN (author) / GAO JIAQI (author)
2025-01-21
Patent
Electronic Resource
Chinese
Building outer wall heat preservation gridding cloth laying construction process
European Patent Office | 2021
|Novel heat preservation decoration construction process for building outer wall
European Patent Office | 2021
|Passive house outer curtain wall heat preservation structure and construction method thereof
European Patent Office | 2024
|Fabricated house outer wall with heat preservation structure
European Patent Office | 2023
|Building heat-preservation outer wall body and heat-preservation construction method
European Patent Office | 2015
|