Coal piling anti-settlement ground structure
The invention relates to a coal piling anti-settlement ground which comprises a first rammed earth layer, a cement cushion layer, a second rammed earth layer, a base layer and a surface layer which are sequentially arranged from bottom to top, a first foundation pile is arranged in the cement cushion layer, and a first drainage supporting device is arranged between the second rammed earth layer and the base layer. The first drainage supporting device is fixedly installed on the first foundation pile, and a drainage pipe is arranged in the cement cushion layer. The foundation is of a five-layer structure, the double rammed earth layers and the cement cushion layer can effectively improve the strength of the foundation, meanwhile, the first drainage supporting device is arranged between the second rammed earth layer and the base layer, the U-shaped first supporting pipe can play a supporting role to prevent ground collapse, and the first supporting pipe is provided with the water absorption holes, so that the water absorption effect is improved. And water in the foundation can enter the water absorption holes and then is drained through the drainage pipe, the rapid drainage effect is achieved, and ground settlement is effectively prevented.
本发明涉及一种堆煤防沉降地面,包括自下而上依次设置的第一夯土层、水泥垫层、第二夯土层、基层以及面层,在水泥垫层内设置有第一基桩、在第二夯土层与基层之间设置有第一排水支撑装置,所述第一排水支撑装置固定安装在第一基桩上,在水泥垫层内设置有排水管;本发明具有五层结构,双夯土层及水泥垫层能够有效提高地基强度,同时在第二夯土层与基层之间设有第一排水支撑装置,呈U形的第一支撑管能够起到支撑作用,防止出现地面塌陷,并且在第一支撑管上设有吸水孔,地基内的水能够进入到吸水孔然后经排水管排出,实现快速排水的效果,有效防止地面出现沉降。
Coal piling anti-settlement ground structure
The invention relates to a coal piling anti-settlement ground which comprises a first rammed earth layer, a cement cushion layer, a second rammed earth layer, a base layer and a surface layer which are sequentially arranged from bottom to top, a first foundation pile is arranged in the cement cushion layer, and a first drainage supporting device is arranged between the second rammed earth layer and the base layer. The first drainage supporting device is fixedly installed on the first foundation pile, and a drainage pipe is arranged in the cement cushion layer. The foundation is of a five-layer structure, the double rammed earth layers and the cement cushion layer can effectively improve the strength of the foundation, meanwhile, the first drainage supporting device is arranged between the second rammed earth layer and the base layer, the U-shaped first supporting pipe can play a supporting role to prevent ground collapse, and the first supporting pipe is provided with the water absorption holes, so that the water absorption effect is improved. And water in the foundation can enter the water absorption holes and then is drained through the drainage pipe, the rapid drainage effect is achieved, and ground settlement is effectively prevented.
本发明涉及一种堆煤防沉降地面,包括自下而上依次设置的第一夯土层、水泥垫层、第二夯土层、基层以及面层,在水泥垫层内设置有第一基桩、在第二夯土层与基层之间设置有第一排水支撑装置,所述第一排水支撑装置固定安装在第一基桩上,在水泥垫层内设置有排水管;本发明具有五层结构,双夯土层及水泥垫层能够有效提高地基强度,同时在第二夯土层与基层之间设有第一排水支撑装置,呈U形的第一支撑管能够起到支撑作用,防止出现地面塌陷,并且在第一支撑管上设有吸水孔,地基内的水能够进入到吸水孔然后经排水管排出,实现快速排水的效果,有效防止地面出现沉降。
Coal piling anti-settlement ground structure
一种堆煤防沉降地面结构
LIU XUEJIA (author) / HAN HAIWEI (author) / YUAN SONGSONG (author) / XI JINPAN (author) / QI YULING (author) / MA YIHAI (author)
2025-01-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
British Library Conference Proceedings | 1997
|Piling and Foundations - Going over old ground - Peterborough's small piling solution
Online Contents | 2006
Anti-deviation positioning device for piling of piling machine
European Patent Office | 2021
|European Patent Office | 2022
|