A platform for research: civil engineering, architecture and urbanism
Turm aus Spannbeton-Fertigteilen
A method for assembling towers using prestressed concrete segments has holes incorporated through the segments to take tensioning cables. The holes are spaced around the circumference of each segment and align with similar holes in the adjacent segments. To ease the feeding of the tensioning cable the top of each hole has a tapering profile, with the widest aperture at the entry to the hole. The taper is between 10 and 150 deg. and the widest aperture is less than the wall thickness of the segments. The holes are formed by performs fitted into the moulds for the segments.
Turm aus Spannbeton-Fertigteilen
A method for assembling towers using prestressed concrete segments has holes incorporated through the segments to take tensioning cables. The holes are spaced around the circumference of each segment and align with similar holes in the adjacent segments. To ease the feeding of the tensioning cable the top of each hole has a tapering profile, with the widest aperture at the entry to the hole. The taper is between 10 and 150 deg. and the widest aperture is less than the wall thickness of the segments. The holes are formed by performs fitted into the moulds for the segments.
Turm aus Spannbeton-Fertigteilen
Tower made of prestressed concrete prefabricated assembly units
Tour constituee d'elements prefabriques en beton precontraint
2015-09-09
Patent
Electronic Resource
German
Brücken aus Spannbeton-Fertigteilen
UB Braunschweig | 1988
|Brücken aus Spannbeton-Fertigteilen
TIBKAT | 1988
|TIBKAT | 1995
|British Library Online Contents | 2006
|Wiley | 2021
|