A platform for research: civil engineering, architecture and urbanism
The road paver (1) has towing machine (2) movable on a plane (4) along a work area. A screed (5) is provided for laying a new road pavement (7). A measuring device (8) is configured to register surface that is depicted as a point cloud by measuring device. The point cloud is extended in three spatial dimensions relative to measuring device to create spatial depiction of surface. Several points of point cloud defined by three-dimensional coordinates are aligned in first direction, and other pair of points of point cloud lies at angle to first direction.
The road paver (1) has towing machine (2) movable on a plane (4) along a work area. A screed (5) is provided for laying a new road pavement (7). A measuring device (8) is configured to register surface that is depicted as a point cloud by measuring device. The point cloud is extended in three spatial dimensions relative to measuring device to create spatial depiction of surface. Several points of point cloud defined by three-dimensional coordinates are aligned in first direction, and other pair of points of point cloud lies at angle to first direction.
Straßenfertiger mit Messvorrichtung
Road finisher with measuring device
Finisseuse de route dotée d'un dispositif de mesure
EUL ACHIM (author)
2015-08-19
Patent
Electronic Resource
German
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE