A platform for research: civil engineering, architecture and urbanism
PREFABRICATED FOOTING FOR WIND TURBINES
It is foreseen that the footing be executed in an excavation, such that a lower concrete slab (2), with its corresponding steel reinforcement, is obtained at the base of the same, and upon which a plurality of prefabricated partitions (3), likewise of concrete, are radially disposed in the shape of a crown at a prefabricated or executed in situ concrete zone (4), such that the spaces defined between these elements are filled with the material (5) obtained by means of the excavation, in order finally to achieve a total or partial upper slab (1) upon this assembly. In this way, and by means of the inclusion of prefabricated elements, the construction works are simplified, which affects favourably both the time frame of execution and the fabrication costs.
PREFABRICATED FOOTING FOR WIND TURBINES
It is foreseen that the footing be executed in an excavation, such that a lower concrete slab (2), with its corresponding steel reinforcement, is obtained at the base of the same, and upon which a plurality of prefabricated partitions (3), likewise of concrete, are radially disposed in the shape of a crown at a prefabricated or executed in situ concrete zone (4), such that the spaces defined between these elements are filled with the material (5) obtained by means of the excavation, in order finally to achieve a total or partial upper slab (1) upon this assembly. In this way, and by means of the inclusion of prefabricated elements, the construction works are simplified, which affects favourably both the time frame of execution and the fabrication costs.
PREFABRICATED FOOTING FOR WIND TURBINES
FERTIGBAUFUNDAMENT FÜR WINDTURBINEN
FONDATION PRÉFABRIQUÉE POUR MÂTS ÉOLIENS
JIMENO CHUECA JOSÉ EMILIO (author) / LLEYDA DIONIS JOSE LUIS (author) / SERNA GARCÍA-CONDE JOSE SALUSTIANO (author)
2017-11-29
Patent
Electronic Resource
English
IPC:
E02D
FOUNDATIONS
,
Gründungen
Design and Analysis of a New Prefabricated Foundation for Onshore Wind Turbines
DOAJ | 2024
|CONFINED GRANULAR FOOTING (EGYPTAHER FOOTING 2)
British Library Conference Proceedings | 1995
|