A platform for research: civil engineering, architecture and urbanism
EINBAUBOHLE
The method involves automatically adjusting a stroke (H) of a condensing unit (13) in dependence of an installation parameter such as installation speed or coating thickness. Frequency (F) or angle of incidence (alpha) of a screed (3) is automatically adjusted in dependence of the installation parameter. An independent claim is also included for a screed for a road finisher.
EINBAUBOHLE
The method involves automatically adjusting a stroke (H) of a condensing unit (13) in dependence of an installation parameter such as installation speed or coating thickness. Frequency (F) or angle of incidence (alpha) of a screed (3) is automatically adjusted in dependence of the installation parameter. An independent claim is also included for a screed for a road finisher.
EINBAUBOHLE
PAVING SCREED
POUTRE LISSEUSE
BUSCHMANN MARTIN (author) / ZEGOWITZ GÜNTER (author) / EUL ACHIM (author) / WEISER RALF (author) / MUNZ ROMAN (author) / ANGERMANN NICOLE (author) / PAWLIK CHRISTIAN (author) / BERTZ KLAUS (author)
2018-08-22
Patent
Electronic Resource
German
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Bohlenanbauteil für eine Einbaubohle, Einbaubohle und Straßenfertiger mit einer Einbaubohle
European Patent Office | 2016
|Einbaubohle für einen Straßenfertiger und Straßenfertiger mit einer Einbaubohle
European Patent Office | 2018
|European Patent Office | 2022
|European Patent Office | 2016
|