A platform for research: civil engineering, architecture and urbanism
ANLAGE UND VERFAHREN ZUR HERSTELLUNG VON ZEMENTKLINKER
A bypass system may be utilized in installations and methods for producing cement clinker. A portion of a kiln offgas produced in a kiln may be branched off as bypass gas via a bypass line connected between the kiln and a calciner. In some cases 3 to 15% of the kiln offgas is branched off as the bypass gas. The bypass gas may be cooled to a temperature in a range from 300 to 550° C. and dedusted in a temperature range from 300 to 550° C. The dedusted bypass gas may then be recirculated to the calciner and/or into a tertiary air line arranged between the cooler and the calciner and/or into a region between the kiln and the calciner.
ANLAGE UND VERFAHREN ZUR HERSTELLUNG VON ZEMENTKLINKER
A bypass system may be utilized in installations and methods for producing cement clinker. A portion of a kiln offgas produced in a kiln may be branched off as bypass gas via a bypass line connected between the kiln and a calciner. In some cases 3 to 15% of the kiln offgas is branched off as the bypass gas. The bypass gas may be cooled to a temperature in a range from 300 to 550° C. and dedusted in a temperature range from 300 to 550° C. The dedusted bypass gas may then be recirculated to the calciner and/or into a tertiary air line arranged between the cooler and the calciner and/or into a region between the kiln and the calciner.
ANLAGE UND VERFAHREN ZUR HERSTELLUNG VON ZEMENTKLINKER
SYSTEM AND METHOD FOR PRODUCING CEMENT CLINKER
DISPOSITIF ET PROCÉDÉ DE PRODUCTION DE CLINKER DE CIMENT
BRINKMANN CHRISTIAN (author) / ADLER KLAUS (author) / BEILMANN REINHARD (author)
2021-07-07
Patent
Electronic Resource
German
IPC:
C04B
Kalk
,
LIME
European Patent Office | 2017
|