A platform for research: civil engineering, architecture and urbanism
INSTALACION PARA VIAS FERREAS CON PLACAS PREFABRICADAS Y PROCEDIMIENTO AUTOMATIZADO DE MONTAJE DE LA MISMA
Installation for railways with prefabricated plates and automated assembly procedure that makes use of it, comprising prefabricated plates (2) of ultra high strength concrete reinforced with steel fibers comprising a particular geometry, a high industrial robot (3) loading capacity intended to move said prefabricated concrete plates (2), a mobile platform (5) capable of moving longitudinally along the road on which the industrial robot (3) is operatively mounted, and a tooling (5) comprising arms stabilizers (44) and perimeter fins (45) configured to be introduced by a central opening (21) of the prefabricated concrete plate (2), in which both the installation and the corresponding assembly procedure thereof, allow Significant improvement in construction, labor and maintenance performance compared to traditional roads built with ballast. (Machine-translation by Google Translate, not legally binding)
Instalación para vías férreas con placas prefabricadas y procedimiento automatizado de montaje que hace uso la misma, que comprende placas prefabricadas (2) de hormigón de ultra alta resistencia reforzado con fibras de acero que comprenden una geometría particular, un robot (3) industrial de alta capacidad de carga destinado a desplazar dichas placas prefabricadas (2) de hormigón, una plataforma móvil (5) capaz de desplazarse longitudinalmente por la vía en la que se monta operativamente el robot (3) industrial, y un utillaje (5) que comprende brazos estabilizadores (44) y unas aletas (45) perimetrales configuradas para ser introducidas por una abertura central (21) de la placa prefabricada (2) de hormigón, en el que tanto la instalación como el correspondiente procedimiento de montaje de la misma, permiten una significativa mejora de los rendimientos constructivos, mano de obra y mantenimiento con respecto a las vías tradicionales construidas con balasto.
INSTALACION PARA VIAS FERREAS CON PLACAS PREFABRICADAS Y PROCEDIMIENTO AUTOMATIZADO DE MONTAJE DE LA MISMA
Installation for railways with prefabricated plates and automated assembly procedure that makes use of it, comprising prefabricated plates (2) of ultra high strength concrete reinforced with steel fibers comprising a particular geometry, a high industrial robot (3) loading capacity intended to move said prefabricated concrete plates (2), a mobile platform (5) capable of moving longitudinally along the road on which the industrial robot (3) is operatively mounted, and a tooling (5) comprising arms stabilizers (44) and perimeter fins (45) configured to be introduced by a central opening (21) of the prefabricated concrete plate (2), in which both the installation and the corresponding assembly procedure thereof, allow Significant improvement in construction, labor and maintenance performance compared to traditional roads built with ballast. (Machine-translation by Google Translate, not legally binding)
Instalación para vías férreas con placas prefabricadas y procedimiento automatizado de montaje que hace uso la misma, que comprende placas prefabricadas (2) de hormigón de ultra alta resistencia reforzado con fibras de acero que comprenden una geometría particular, un robot (3) industrial de alta capacidad de carga destinado a desplazar dichas placas prefabricadas (2) de hormigón, una plataforma móvil (5) capaz de desplazarse longitudinalmente por la vía en la que se monta operativamente el robot (3) industrial, y un utillaje (5) que comprende brazos estabilizadores (44) y unas aletas (45) perimetrales configuradas para ser introducidas por una abertura central (21) de la placa prefabricada (2) de hormigón, en el que tanto la instalación como el correspondiente procedimiento de montaje de la misma, permiten una significativa mejora de los rendimientos constructivos, mano de obra y mantenimiento con respecto a las vías tradicionales construidas con balasto.
INSTALACION PARA VIAS FERREAS CON PLACAS PREFABRICADAS Y PROCEDIMIENTO AUTOMATIZADO DE MONTAJE DE LA MISMA
INSTALLATION FOR RAILWAYS WITH PREFABRICATED PLATES AND AUTOMATED ASSEMBLY PROCEDURE OF THE SAME (Machine-translation by Google Translate, not legally binding)
INSA FRANCO RICARDO (author) / SALVADOR ZURIAGA PABLO (author) / VILLALBA SANCHÍS IGNACIO (author) / MARTÍNEZ FERNÁNDEZ PABLO (author) / CARRASCO JIMÉNEZ RAMÓN (author) / ORRA SERRA ORIOL (author) / RÀFOLS RIBAS IRENE (author) / BAIGES FRANQUET SERGI (author) / MARTÍN MAÑAS DANIEL (author) / GARCÍA VILLENA FRANCISCO ANTONIO (author)
2019-11-06
Patent
Electronic Resource
Spanish
Método para la instalación de vías férreas en balasto, sin una vía auxiliar
European Patent Office | 2016
|Procedimiento de renovación de vías férreas y dispositivo para su realización
European Patent Office | 2020
|Sistema y método para transportar un aparato de vías férreas
European Patent Office | 2020
|