PROCEDIMIENTO DE INSTALACION DE PLAYA ARTIFICIAL DE AGUA CORRIENTE PARA RECREO
Installation procedure for an artificial beach with running water for recreation intended for the installation of an artificial dug beach (1) with running water for recreational and contemplative use, using water collected (9) from an external body of water (2), of any origin, which will be treated by a flotation/decantation system (20), without the need to use filters and without the need to recirculate the water (6) from the excavated artificial beach (1), where the water (6) from the excavated artificial beach (1) is returned to the external body of water (2) in better conditions than those in which the water was collected (9). (Machine-translation by Google Translate, not legally binding)
Procedimiento de instalación de playa artificial de agua corriente para recreo destinado a la instalación de una playa artificial excavada (1) de agua corriente para uso recreativo y contemplativo, utilizando agua captada (9) de una masa de agua externa (2), de cualquier origen, que será tratada por un sistema de flotación/decantación (20), sin necesidad de utilizar filtros y sin necesidad de recirculación del agua (6) procedente de la playa artificial excavada (1), en donde el agua (6) de la playa artificial excavada (1) se devuelve a la masa de agua externa (2) en mejores condiciones de las que se captó el agua (9).
PROCEDIMIENTO DE INSTALACION DE PLAYA ARTIFICIAL DE AGUA CORRIENTE PARA RECREO
Installation procedure for an artificial beach with running water for recreation intended for the installation of an artificial dug beach (1) with running water for recreational and contemplative use, using water collected (9) from an external body of water (2), of any origin, which will be treated by a flotation/decantation system (20), without the need to use filters and without the need to recirculate the water (6) from the excavated artificial beach (1), where the water (6) from the excavated artificial beach (1) is returned to the external body of water (2) in better conditions than those in which the water was collected (9). (Machine-translation by Google Translate, not legally binding)
Procedimiento de instalación de playa artificial de agua corriente para recreo destinado a la instalación de una playa artificial excavada (1) de agua corriente para uso recreativo y contemplativo, utilizando agua captada (9) de una masa de agua externa (2), de cualquier origen, que será tratada por un sistema de flotación/decantación (20), sin necesidad de utilizar filtros y sin necesidad de recirculación del agua (6) procedente de la playa artificial excavada (1), en donde el agua (6) de la playa artificial excavada (1) se devuelve a la masa de agua externa (2) en mejores condiciones de las que se captó el agua (9).
PROCEDIMIENTO DE INSTALACION DE PLAYA ARTIFICIAL DE AGUA CORRIENTE PARA RECREO
INSTALLATION PROCEDURE FOR ARTIFICIAL RUNNING WATER BEACH FOR RECREATION (Machine-translation by Google Translate, not legally binding)
GOMES DE OLIVEIRA JOÃO CARLOS (author) / GOMES DE OLIVEIRA NETTO PROCÓPIO (author) / GOMES DE OLIVEIRA FELIPE (author) / GOMES DE OLIVEIRA DANIEL (author)
2023-04-11
Patent
Electronic Resource
Spanish
Procedimiento y dispositivo para economizar energía calorífica y agua en una instalación sanitaria