A platform for research: civil engineering, architecture and urbanism
Climbing formwork
The climbing formwork comprises a formwork panel mounted on a carriage 10 secured to a track 11 attached to a platform. The track comprises a first plurality of holes 40 with an equal first spacing therebetween, and the carriage comprises a locking means 10a with a peg 44 and a second plurality of (e.g. three) holes 41,42,43 overlying the first plurality of holes. Inserting the peg through one each of the first and second pluralities of holes locks the carriage on the track. The spacing of adjacent ones of the second plurality of holes differs from (e.g. is less than) the first spacing by a non-integer multiple (e.g. one third) of the first spacing. The spacing between adjacent of the second plurality of holes optionally includes an additional varying integer multiple of the first spacing. The peg may be a shear plate and the holes rectangular and/or on an upper surface 39 of the track. The carriage may be pushed manually or moved by a rack and pinion.
Climbing formwork
The climbing formwork comprises a formwork panel mounted on a carriage 10 secured to a track 11 attached to a platform. The track comprises a first plurality of holes 40 with an equal first spacing therebetween, and the carriage comprises a locking means 10a with a peg 44 and a second plurality of (e.g. three) holes 41,42,43 overlying the first plurality of holes. Inserting the peg through one each of the first and second pluralities of holes locks the carriage on the track. The spacing of adjacent ones of the second plurality of holes differs from (e.g. is less than) the first spacing by a non-integer multiple (e.g. one third) of the first spacing. The spacing between adjacent of the second plurality of holes optionally includes an additional varying integer multiple of the first spacing. The peg may be a shear plate and the holes rectangular and/or on an upper surface 39 of the track. The carriage may be pushed manually or moved by a rack and pinion.
Climbing formwork
MARK TAYLOR (author) / RICHARD FORSHAW (author)
2022-02-23
Patent
Electronic Resource
English
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Hydraulic climbing formwork and climbing formwork construction method
European Patent Office | 2021
|