PILE-TYPE LIQUEFACTION COUNTERMEASURE STRUCTURE AND CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To provide a pile-type liquefaction countermeasure structure for the ground, capable of suppressing a lateral flow of a liquefaction layer easily at low cost without using special materials, and a construction method thereof.SOLUTION: A pile-type liquefaction countermeasure structure 1 comprises: a plurality of piles 3 constructed in the ground G including a liquefaction layer 5 so as to be spaced from each other; and plate-like structures 6 each of which is arranged so as to surround a head part 3a of each pile 3. The head part 3a of each pile 3 is fixed to the plate-like structure 6 over a predetermined height (t). The piles 3 are constructed after installing the plate-like structures 6. As described above, all piles 3 are fixed at side surfaces of the head parts 3a with the plate-like structures 6, thereby falling down of the piles 3 are prevented and a lateral flow of the liquefaction layer 5 is suppressed.
【課題】特殊な材料を用いることなく、安価かつ容易に液状化層の側方流動を抑制することができる、地盤の杭式液状化対策構造体およびその構築方法を提供する。【解決手段】液状化層5が存在する地盤Gに互いに離間するように構築される複数の杭3と、各杭3の頭部3aを囲繞するように設けられた板状構造体6とを有し、各杭3の頭部3aを所定の高さ(t)にわたって板状構造体6に固定して杭式液状化対策構造体1とする。杭3を構築する際には、板状構造体6を設置した後に行う。このようにすべての杭3を頭部3aの側面で板状構造体6により固定することにより、杭3の転倒が防止され、液状化層5の側方流動が抑制される。【選択図】図1
PILE-TYPE LIQUEFACTION COUNTERMEASURE STRUCTURE AND CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To provide a pile-type liquefaction countermeasure structure for the ground, capable of suppressing a lateral flow of a liquefaction layer easily at low cost without using special materials, and a construction method thereof.SOLUTION: A pile-type liquefaction countermeasure structure 1 comprises: a plurality of piles 3 constructed in the ground G including a liquefaction layer 5 so as to be spaced from each other; and plate-like structures 6 each of which is arranged so as to surround a head part 3a of each pile 3. The head part 3a of each pile 3 is fixed to the plate-like structure 6 over a predetermined height (t). The piles 3 are constructed after installing the plate-like structures 6. As described above, all piles 3 are fixed at side surfaces of the head parts 3a with the plate-like structures 6, thereby falling down of the piles 3 are prevented and a lateral flow of the liquefaction layer 5 is suppressed.
【課題】特殊な材料を用いることなく、安価かつ容易に液状化層の側方流動を抑制することができる、地盤の杭式液状化対策構造体およびその構築方法を提供する。【解決手段】液状化層5が存在する地盤Gに互いに離間するように構築される複数の杭3と、各杭3の頭部3aを囲繞するように設けられた板状構造体6とを有し、各杭3の頭部3aを所定の高さ(t)にわたって板状構造体6に固定して杭式液状化対策構造体1とする。杭3を構築する際には、板状構造体6を設置した後に行う。このようにすべての杭3を頭部3aの側面で板状構造体6により固定することにより、杭3の転倒が防止され、液状化層5の側方流動が抑制される。【選択図】図1
PILE-TYPE LIQUEFACTION COUNTERMEASURE STRUCTURE AND CONSTRUCTION METHOD THEREOF
杭式液状化対策構造体およびその構築方法
TAKAHASHI NAOKI (author) / KUROKAWA YUKIHIKO (author) / FUJITA MANABU (author) / SHIBATA TOSHIO (author) / NAKAMORI JUNICHIRO (author) / MORIKAWA YOSHIYUKI (author) / KOHAMA EIJI (author) / SASA SHINJI (author) / TAKAHASHI HIDENORI (author) / TOHATA IKUO (author)
2015-06-04
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
LIQUEFACTION COUNTERMEASURE FOUNDATION PILE AND LIQUEFACTION COUNTERMEASURE FOUNDATION STRUCTURE
European Patent Office | 2015
|LIQUEFACTION COUNTERMEASURE CONSTRUCTION METHOD AND LIQUEFACTION COUNTERMEASURE STRUCTURE
European Patent Office | 2021
|European Patent Office | 2024
|European Patent Office | 2020
|European Patent Office | 2022
|