A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide a pinning method capable of properly repairing a wall body stuck with a finishing material via a sticking material thickly walled in a dor shape or a belt shape on a skeleton.SOLUTION: The pinning method is provided for repairing the wall body 1 of sticking a stone material by glass-wool to a concrete skeleton 2, and comprises a boring process of forming an insertion-filling hole 11 of penetrating through the stone material 5 and reaching the concrete skeleton 2 in a cavity area 6 dislocated from a sticking material 4, an installing process of installing a cylindrical body 13 corresponding to the insertion-filling hole 11 in the insertion-filling hole 11 so as to extend between the stone material 5 and the concrete skeleton 2, an injection process of injecting an adhesive R inside the insertion-filling hole 11 and the cylindrical body 13 and an insertion-filling process of inserting-filling an anchor pin 12 into the insertion-filling hole 11 via the cylindrical body 13.
【課題】躯体に、点状または帯状に盛り付けた張付け材を介して仕上げ材が張り付けられた壁体に対し、適切に補修を行うことができるピンニング工法を提供する。【解決手段】石材5がコンクリート躯体2にダンゴ張り等された壁体1を補修するピンニング工法であって、張付け材4から外れた空隙領域6に、石材5を貫通し且つコンクリート躯体2に達する挿填穴11を形成する穿孔工程と、挿填穴11に対応する筒状体13を、石材5およびコンクリート躯体2間に渡すように挿填穴11に装着する装着工程と、挿填穴11および筒状体13の内部に接着剤Rを注入する注入工程と、筒状体13を介して、アンカーピン12を挿填穴11に挿填する挿填工程と、を備えたものである。【選択図】図2
PROBLEM TO BE SOLVED: To provide a pinning method capable of properly repairing a wall body stuck with a finishing material via a sticking material thickly walled in a dor shape or a belt shape on a skeleton.SOLUTION: The pinning method is provided for repairing the wall body 1 of sticking a stone material by glass-wool to a concrete skeleton 2, and comprises a boring process of forming an insertion-filling hole 11 of penetrating through the stone material 5 and reaching the concrete skeleton 2 in a cavity area 6 dislocated from a sticking material 4, an installing process of installing a cylindrical body 13 corresponding to the insertion-filling hole 11 in the insertion-filling hole 11 so as to extend between the stone material 5 and the concrete skeleton 2, an injection process of injecting an adhesive R inside the insertion-filling hole 11 and the cylindrical body 13 and an insertion-filling process of inserting-filling an anchor pin 12 into the insertion-filling hole 11 via the cylindrical body 13.
【課題】躯体に、点状または帯状に盛り付けた張付け材を介して仕上げ材が張り付けられた壁体に対し、適切に補修を行うことができるピンニング工法を提供する。【解決手段】石材5がコンクリート躯体2にダンゴ張り等された壁体1を補修するピンニング工法であって、張付け材4から外れた空隙領域6に、石材5を貫通し且つコンクリート躯体2に達する挿填穴11を形成する穿孔工程と、挿填穴11に対応する筒状体13を、石材5およびコンクリート躯体2間に渡すように挿填穴11に装着する装着工程と、挿填穴11および筒状体13の内部に接着剤Rを注入する注入工程と、筒状体13を介して、アンカーピン12を挿填穴11に挿填する挿填工程と、を備えたものである。【選択図】図2
PINNING METHOD
ピンニング工法
FUJITA SHOGO (author)
2015-06-25
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2020
|INJECTION NOZZLE FOR PINNING METHOD AND PINNING METHOD USING THE SAME
European Patent Office | 2020
|INJECTION NOZZLE FOR PINNING METHOD, AND PINNING METHOD USING THE SAME
European Patent Office | 2020
|