A platform for research: civil engineering, architecture and urbanism
LOADING METHOD FOR BUILDING FACILITY, AND MANUFACTURING METHOD FOR BUILDING
PROBLEM TO BE SOLVED: To provide a loading method for building facilities, which enables the building facilities to be suitably loaded in a skeleton unit, and a manufacturing method for a building, which can suitably increase manufacturing efficiency.SOLUTION: In a loading method for a bath unit 30, in which a unit body 31 having a bath tub and a floor panel are loaded on a frame 32, the bath unit 30 is loaded in a building unit 10. The loading method for the bath unit 30 includes the steps of: loading the bath unit 30 on a carriage 60 for a bath unit in the state of interposing a bedding material 70 under the frame 32; guiding the bath unit 30 to a position to place it side by side with the building unit 10 in the state of loading the bath unit 30 on the carriage 60 for a bath unit; and transferring the bath unit 30 together with the bedding material 70 to the building unit 10 from the carriage 60 for a bath unit by moving the bath unit 30 in a loading direction in the state of arranging the carriage 60 for a bath unit in a position to place it side by side with the building unit 10.
【課題】躯体ユニットへの建物設備の搭載を好適に行うことができる建物設備の搭載方法及び製造効率を好適に向上することができる建物の製造方法の提供を目的とする。【解決手段】浴槽や床パネルを有するユニット本体31を架台32に載せたバスユニット30を、建物ユニット10に搭載するバスユニット30の搭載方法であって、バスユニット30を架台32の下に敷材70を介在させた状態でバスユニット用台車60に載せる工程と、バスユニット30をバスユニット用台車60に載せた状態で建物ユニット10と並ぶ位置へ案内する工程と、バスユニット用台車60を建物ユニット10に並ぶ位置に配した状態にて当該バスユニット30を投入方向に移動させることにより、同バスユニット30をバスユニット用台車60から建物ユニット10へ敷材70ごと受け渡す工程とを有しているバスユニット30の搭載方法。【選択図】 図4
LOADING METHOD FOR BUILDING FACILITY, AND MANUFACTURING METHOD FOR BUILDING
PROBLEM TO BE SOLVED: To provide a loading method for building facilities, which enables the building facilities to be suitably loaded in a skeleton unit, and a manufacturing method for a building, which can suitably increase manufacturing efficiency.SOLUTION: In a loading method for a bath unit 30, in which a unit body 31 having a bath tub and a floor panel are loaded on a frame 32, the bath unit 30 is loaded in a building unit 10. The loading method for the bath unit 30 includes the steps of: loading the bath unit 30 on a carriage 60 for a bath unit in the state of interposing a bedding material 70 under the frame 32; guiding the bath unit 30 to a position to place it side by side with the building unit 10 in the state of loading the bath unit 30 on the carriage 60 for a bath unit; and transferring the bath unit 30 together with the bedding material 70 to the building unit 10 from the carriage 60 for a bath unit by moving the bath unit 30 in a loading direction in the state of arranging the carriage 60 for a bath unit in a position to place it side by side with the building unit 10.
【課題】躯体ユニットへの建物設備の搭載を好適に行うことができる建物設備の搭載方法及び製造効率を好適に向上することができる建物の製造方法の提供を目的とする。【解決手段】浴槽や床パネルを有するユニット本体31を架台32に載せたバスユニット30を、建物ユニット10に搭載するバスユニット30の搭載方法であって、バスユニット30を架台32の下に敷材70を介在させた状態でバスユニット用台車60に載せる工程と、バスユニット30をバスユニット用台車60に載せた状態で建物ユニット10と並ぶ位置へ案内する工程と、バスユニット用台車60を建物ユニット10に並ぶ位置に配した状態にて当該バスユニット30を投入方向に移動させることにより、同バスユニット30をバスユニット用台車60から建物ユニット10へ敷材70ごと受け渡す工程とを有しているバスユニット30の搭載方法。【選択図】 図4
LOADING METHOD FOR BUILDING FACILITY, AND MANUFACTURING METHOD FOR BUILDING
建物設備の搭載方法及び建物の製造方法
NAKAJIMA KEITA (author)
2015-07-23
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
LOADING METHOD FOR FRAME FOR EXTERIOR WALL OF BUILDING, AND MANUFACTURING METHOD FOR BUILDING
European Patent Office | 2015
|