A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF SUSPENDED CEILING AND SUSPENDED CEILING
PROBLEM TO BE SOLVED: To provide construction method of suspended ceiling and suspended ceiling capable of improving aseismatic performance.SOLUTION: The method comprises: a fixing step in which a plurality of panel materials 31 are preserved, in which a fixation base 50 and a first engaging part 52 at bottom thereof are formed in an extending manner in a longitudinal direction on one edge part 48 at one side in a width direction and second engaging part 59 is formed in the extending manner in the longitudinal direction on the other edge part 58 at the other side in the width direction, and the fixation base 50 of a former panel material 31(A) is fixed on a suspended ceiling base; and an engagement step in which a second engaging part 59 of a later panel material 31 (B) is engaged on the first engaging part 52 of the former panel material 31. The steps are mutually performed so as to align the plurality of panel materials 31 on the suspended ceiling base to form a ceiling panel. Between the fixing step and the engagement step, application step is performed, in which adhesive agent S for attaching the one end part 48 of the former panel material 31(A) or the other end of the later panel material 31 (B) is applied on them.
【課題】耐震性能を向上させることができる吊り天井の施工方法および吊り天井の提供。【解決手段】幅方向一側の一端縁部48に、固定ベース50およびその下側の第1係合部52が長さ方向に延在形成され、幅方向他側の他端縁部58に第2係合部59が長さ方向に延在形成されてなるパネル材31を複数用意し、先行のパネル材31(A)の固定ベース50を吊り天井下地に固定する固定工程と、先行のパネル材31の第1係合部52に、後行のパネル材31(B)の第2係合部59を係合させる係合工程と、を交互に行って複数のパネル材31を吊り天井下地に並設して天井パネルを形成する方法であって、固定工程と係合工程との間に、先行のパネル材31(A)の一端縁部48または後行のパネル材31(B)の他端縁部58にこれらを接着する接着剤Sを塗布する塗布工程を行う。【選択図】図3
CONSTRUCTION METHOD OF SUSPENDED CEILING AND SUSPENDED CEILING
PROBLEM TO BE SOLVED: To provide construction method of suspended ceiling and suspended ceiling capable of improving aseismatic performance.SOLUTION: The method comprises: a fixing step in which a plurality of panel materials 31 are preserved, in which a fixation base 50 and a first engaging part 52 at bottom thereof are formed in an extending manner in a longitudinal direction on one edge part 48 at one side in a width direction and second engaging part 59 is formed in the extending manner in the longitudinal direction on the other edge part 58 at the other side in the width direction, and the fixation base 50 of a former panel material 31(A) is fixed on a suspended ceiling base; and an engagement step in which a second engaging part 59 of a later panel material 31 (B) is engaged on the first engaging part 52 of the former panel material 31. The steps are mutually performed so as to align the plurality of panel materials 31 on the suspended ceiling base to form a ceiling panel. Between the fixing step and the engagement step, application step is performed, in which adhesive agent S for attaching the one end part 48 of the former panel material 31(A) or the other end of the later panel material 31 (B) is applied on them.
【課題】耐震性能を向上させることができる吊り天井の施工方法および吊り天井の提供。【解決手段】幅方向一側の一端縁部48に、固定ベース50およびその下側の第1係合部52が長さ方向に延在形成され、幅方向他側の他端縁部58に第2係合部59が長さ方向に延在形成されてなるパネル材31を複数用意し、先行のパネル材31(A)の固定ベース50を吊り天井下地に固定する固定工程と、先行のパネル材31の第1係合部52に、後行のパネル材31(B)の第2係合部59を係合させる係合工程と、を交互に行って複数のパネル材31を吊り天井下地に並設して天井パネルを形成する方法であって、固定工程と係合工程との間に、先行のパネル材31(A)の一端縁部48または後行のパネル材31(B)の他端縁部58にこれらを接着する接着剤Sを塗布する塗布工程を行う。【選択図】図3
CONSTRUCTION METHOD OF SUSPENDED CEILING AND SUSPENDED CEILING
吊り天井の施工方法および吊り天井
FUJISAWA TADAHIRO (author) / TANAKA TOSHIYA (author)
2015-08-03
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
SUSPENDED CEILING STRUCTURE AND SUSPENDED CEILING CONSTRUCTION METHOD
European Patent Office | 2015
|European Patent Office | 2019
|European Patent Office | 2022
|European Patent Office | 2024
|Ceiling hole prefabricated suspended ceiling construction method
European Patent Office | 2024
|