A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide a sheet pile driving method which improves self-standing of a sheet pile, which dispenses with injection of a grout material such as mortar and cement for foot protection, and which does not adversely affect an environment.SOLUTION: Hard ground G such as a bedrock is pre-bored at regular intervals by a ground excavator 15. A sheet pile 1 exclusive to pre-boring, the tip part of which is reinforced and which comprises tips 3 and 4 for cutting and crushing the bedrock, is driven to a predetermined depth into an unexcavated hard ground section g between adjacent bored holes 12 and 12 of bored holes 12, which are bored by the pre-boring, by a sheet pile driver 5. After the sheet pile 1 exclusive to the pre-boring is extracted, the sheet pile driver 5 makes a permanent sheet pile 11 driven to a predetermined depth into a pre-boring-specific sheet pile driving trace 6 formed in the unexcavated hard ground section g by the sheet pile 1 exclusive to the pre-boring.
【課題】矢板の自立性を高め、根固め用のモルタルやセメント等のグラウト材の注入が不要で、環境に悪影響を及ぼすことのない矢板打設工法を提供すること。【解決手段】岩盤等の硬質地盤Gを地盤掘削機15によって一定間隔おきにプレボーリングし、プレボーリングによる掘削孔12の隣り合う掘削孔12,12間の未掘削硬質地盤部gに、矢板先端部が補強されて岩盤切削破砕用チップ3,4を備えた先行堀り専用矢板1を、矢板打設機5によって所定深度まで打設し、先行堀り専用矢板1を引き抜いた後、先行堀り専用矢板1によって前記未掘削硬質地盤部gに形成された先行堀り専用矢板打設痕6に本矢板11を矢板打設機5によって所定深度まで打設する。【選択図】図3
PROBLEM TO BE SOLVED: To provide a sheet pile driving method which improves self-standing of a sheet pile, which dispenses with injection of a grout material such as mortar and cement for foot protection, and which does not adversely affect an environment.SOLUTION: Hard ground G such as a bedrock is pre-bored at regular intervals by a ground excavator 15. A sheet pile 1 exclusive to pre-boring, the tip part of which is reinforced and which comprises tips 3 and 4 for cutting and crushing the bedrock, is driven to a predetermined depth into an unexcavated hard ground section g between adjacent bored holes 12 and 12 of bored holes 12, which are bored by the pre-boring, by a sheet pile driver 5. After the sheet pile 1 exclusive to the pre-boring is extracted, the sheet pile driver 5 makes a permanent sheet pile 11 driven to a predetermined depth into a pre-boring-specific sheet pile driving trace 6 formed in the unexcavated hard ground section g by the sheet pile 1 exclusive to the pre-boring.
【課題】矢板の自立性を高め、根固め用のモルタルやセメント等のグラウト材の注入が不要で、環境に悪影響を及ぼすことのない矢板打設工法を提供すること。【解決手段】岩盤等の硬質地盤Gを地盤掘削機15によって一定間隔おきにプレボーリングし、プレボーリングによる掘削孔12の隣り合う掘削孔12,12間の未掘削硬質地盤部gに、矢板先端部が補強されて岩盤切削破砕用チップ3,4を備えた先行堀り専用矢板1を、矢板打設機5によって所定深度まで打設し、先行堀り専用矢板1を引き抜いた後、先行堀り専用矢板1によって前記未掘削硬質地盤部gに形成された先行堀り専用矢板打設痕6に本矢板11を矢板打設機5によって所定深度まで打設する。【選択図】図3
SHEET PILE DRIVING METHOD
矢板打設工法
KASHIMOTO TAKAHIKO (author)
2015-08-13
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Jetting-Assisted Sheet Pile Driving
British Library Conference Proceedings | 2002
|Sheet pile vibro-driving: Power pack-vibrator-sheet pile-soil interactions
British Library Conference Proceedings | 2008
|European Patent Office | 2019
|Sheet pile vibro-driving: Assumptions vs. measurements
British Library Conference Proceedings | 2008
|Silent and vibration-free sheet pile driving
Engineering Index Backfile | 1968
|