PROBLEM TO BE SOLVED: To provide an installation method capable of accurately installing a foundation pile in a predetermined position, and to also provide an installation auxiliary member for accurately installing the foundation pile in the predetermined position.SOLUTION: An installation auxiliary member 1 is used, and the installation auxiliary member 1 comprises at least three guide parts 2, 3 and 5 and a connection part 6 for connecting the three guide parts 2, 3 and 5, and the three guide parts 2, 3 and 5 execute a reference setting process capable of respectively inserting foundation piles 100a, 100b and 100c and of installing at least two foundation piles 100a and 100b in the ground surface, a positioning process of positioning the two guide parts 2 and 3 to the two foundation piles 100a and 100b and an installation process of installing the foundation pile 100c in a residual guide part 5 among the three guide parts 2, 3 and 5, in this order.
【課題】基礎杭を所定の位置に正確に打設できる打設工法を提供する。また、基礎杭を所定の位置に正確に打設するための打設補助部材を提供する。【解決手段】打設補助部材1を使用し、打設補助部材1は、少なくとも3つのガイド部2,3,5と、3つのガイド部2,3,5を連結する連結部6を有し、3つのガイド部2,3,5は、それぞれ基礎杭100a,100b,100cを挿入可能であり、少なくとも2本の基礎杭100a,100bを地面に打設する基準設定工程と、2本の基礎杭100a,100bに対して2つのガイド部2,3を位置決めする位置決め工程と、3つのガイド部2,3,5のうち、残りのガイド部5に基礎杭100cを打設する打設工程をこの順に行う。【選択図】図12
PROBLEM TO BE SOLVED: To provide an installation method capable of accurately installing a foundation pile in a predetermined position, and to also provide an installation auxiliary member for accurately installing the foundation pile in the predetermined position.SOLUTION: An installation auxiliary member 1 is used, and the installation auxiliary member 1 comprises at least three guide parts 2, 3 and 5 and a connection part 6 for connecting the three guide parts 2, 3 and 5, and the three guide parts 2, 3 and 5 execute a reference setting process capable of respectively inserting foundation piles 100a, 100b and 100c and of installing at least two foundation piles 100a and 100b in the ground surface, a positioning process of positioning the two guide parts 2 and 3 to the two foundation piles 100a and 100b and an installation process of installing the foundation pile 100c in a residual guide part 5 among the three guide parts 2, 3 and 5, in this order.
【課題】基礎杭を所定の位置に正確に打設できる打設工法を提供する。また、基礎杭を所定の位置に正確に打設するための打設補助部材を提供する。【解決手段】打設補助部材1を使用し、打設補助部材1は、少なくとも3つのガイド部2,3,5と、3つのガイド部2,3,5を連結する連結部6を有し、3つのガイド部2,3,5は、それぞれ基礎杭100a,100b,100cを挿入可能であり、少なくとも2本の基礎杭100a,100bを地面に打設する基準設定工程と、2本の基礎杭100a,100bに対して2つのガイド部2,3を位置決めする位置決め工程と、3つのガイド部2,3,5のうち、残りのガイド部5に基礎杭100cを打設する打設工程をこの順に行う。【選択図】図12
INSTALLATION METHOD OF FOUNDATION PILE AND INSTALLATION AUXILIARY MEMBER
基礎杭の打設工法及び打設補助部材
OE HIDEKI (author)
2015-08-24
Patent
Electronic Resource
Japanese