LEVEE BODY, LEVEE BODY CONSTITUTING MEMBER AND CONSTRUCTION METHOD OF LEVEE BODY
PROBLEM TO BE SOLVED: To provide a levee body which is excellent in construction performance, and easy in the processing of a vertical seam, a levee body constituting member, and a construction method of the levee body which is easy in the filling work of a filler and the management of the filling work.SOLUTION: A levee body comprises a steel pipe pile 2, a footing part 3, and a precast wall body 4. The footing part 3 has a steel horizontal material 5, a steel vertical material 8 is joined to the steel horizontal material 5, a side end part of the precast wall body 4 is engaged with the steel vertical material 8, and thus the precast wall bodies 4 which adjoin each other via the steel vertical material 8 are joined to each other in a horizontal direction. Since there is arranged a coated member 15 which coats a joining part of the precast wall part 4 at each steel vertical material 8, and a filler 16 is filled into the coated member 15, the weight of the precast wall body 4 can be reduced compared with a conventional technology, construction performance becomes favorable accordingly, and thereby a construction period can be shortened. Furthermore, the construction of a curved part and the processing of a vertical seam are easy, and the filling work of the filler 16 and the management of the filling work are easy.
【課題】施工性に優れかつ曲線部の施工や縦目地の処理も容易である堤体や堤体構成部材、さらに充填材の施工および施工管理が容易な堤体の施工方法を提供する。【解決手段】鋼管杭2と、フーチング部3と、プレキャスト壁体4とを備え、フーチング部3は鋼製横材5を有し、鋼製横材5に鋼製縦材8が接合され、プレキャスト壁体4の側端部が鋼製縦材8に係合されることで、鋼製縦材8を介して隣り合うプレキャスト壁体4が横方向に接合され、プレキャスト壁体4の接合部を鋼製縦材8ごと被覆する被覆部材15を備え、被覆部材15の内側に充填材16を充填するので、プレキャスト壁体4の重量を従来に比して軽減でき、よって、施工性がよく全体として施工の短縮化を図ることができる。また、曲線部の施工や縦目地の処理も容易であり、充填材16の施工および施工管理が容易である。【選択図】図1
LEVEE BODY, LEVEE BODY CONSTITUTING MEMBER AND CONSTRUCTION METHOD OF LEVEE BODY
PROBLEM TO BE SOLVED: To provide a levee body which is excellent in construction performance, and easy in the processing of a vertical seam, a levee body constituting member, and a construction method of the levee body which is easy in the filling work of a filler and the management of the filling work.SOLUTION: A levee body comprises a steel pipe pile 2, a footing part 3, and a precast wall body 4. The footing part 3 has a steel horizontal material 5, a steel vertical material 8 is joined to the steel horizontal material 5, a side end part of the precast wall body 4 is engaged with the steel vertical material 8, and thus the precast wall bodies 4 which adjoin each other via the steel vertical material 8 are joined to each other in a horizontal direction. Since there is arranged a coated member 15 which coats a joining part of the precast wall part 4 at each steel vertical material 8, and a filler 16 is filled into the coated member 15, the weight of the precast wall body 4 can be reduced compared with a conventional technology, construction performance becomes favorable accordingly, and thereby a construction period can be shortened. Furthermore, the construction of a curved part and the processing of a vertical seam are easy, and the filling work of the filler 16 and the management of the filling work are easy.
【課題】施工性に優れかつ曲線部の施工や縦目地の処理も容易である堤体や堤体構成部材、さらに充填材の施工および施工管理が容易な堤体の施工方法を提供する。【解決手段】鋼管杭2と、フーチング部3と、プレキャスト壁体4とを備え、フーチング部3は鋼製横材5を有し、鋼製横材5に鋼製縦材8が接合され、プレキャスト壁体4の側端部が鋼製縦材8に係合されることで、鋼製縦材8を介して隣り合うプレキャスト壁体4が横方向に接合され、プレキャスト壁体4の接合部を鋼製縦材8ごと被覆する被覆部材15を備え、被覆部材15の内側に充填材16を充填するので、プレキャスト壁体4の重量を従来に比して軽減でき、よって、施工性がよく全体として施工の短縮化を図ることができる。また、曲線部の施工や縦目地の処理も容易であり、充填材16の施工および施工管理が容易である。【選択図】図1
LEVEE BODY, LEVEE BODY CONSTITUTING MEMBER AND CONSTRUCTION METHOD OF LEVEE BODY
堤体、堤体構成部材および堤体の施工方法
IKEDA MAKOTO (author) / KITAMURA TAKUYA (author) / KAMIENOO YOSHIAKI (author) / KUROSAWA TATSUAKI (author) / OTOSHI KAZUTAKA (author)
2015-09-28
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau