A platform for research: civil engineering, architecture and urbanism
FIXING CLIP
PROBLEM TO BE SOLVED: To provide a fixing clip capable of temporarily fixing a bolt to a construction member such as a crossing portion of a beam.SOLUTION: A fixing clip (10) of this invention comprises first and second plates (12) oppositely facing each other while being spaced apart; third plate part (13) connecting base end edges; and a pair of walls (15) raised from both side edges of the second plate part (12), protruded toward the first plate part (11) and supporting a head part (H) of a bolt (B). The first plate part (11) is formed with a recess (14) cut from a tip end edge toward the third plate part (13) into which a shank part (S) of the bolt (B) can be inserted. Either the first plate part (11) or the third plate part (13) is further formed with a cutting line enabling an area (10r) including the recess (14) to be separated, and the second plate part (12) is formed with a through-pass into which the shank part (S) of the bolt (B) can be inserted.
【課題】梁の直交部分などの建築部材にボルトを仮固定することができる固定クリップを提供する。【解決手段】本発明の固定クリップ(10)は、間隔を隔てて対向する第1および第2プレート部(12)と、基端縁同士を接続する第3プレート部(13)と、第2プレート部(12)の両側縁から立ち上がり第1プレート部(11)に向かって突出し、ボルト(B)の頭部(H)を支持する一対の壁部(15)とを備えている。第1プレート部(11)には、先端縁から第3プレート部(13)に向かって切り欠かれ、ボルト(B)の軸部(S)が挿入可能な切り欠き(14)が形成され、第1プレート部(11)または第3プレート部(13)には、切り欠き(14)を含む領域(10r)を分離可能にするための切断線がさらに形成され、第2プレート部(12)には、ボルト(B)の軸部(S)が挿入可能な貫通穴が形成されている。【選択図】図17
FIXING CLIP
PROBLEM TO BE SOLVED: To provide a fixing clip capable of temporarily fixing a bolt to a construction member such as a crossing portion of a beam.SOLUTION: A fixing clip (10) of this invention comprises first and second plates (12) oppositely facing each other while being spaced apart; third plate part (13) connecting base end edges; and a pair of walls (15) raised from both side edges of the second plate part (12), protruded toward the first plate part (11) and supporting a head part (H) of a bolt (B). The first plate part (11) is formed with a recess (14) cut from a tip end edge toward the third plate part (13) into which a shank part (S) of the bolt (B) can be inserted. Either the first plate part (11) or the third plate part (13) is further formed with a cutting line enabling an area (10r) including the recess (14) to be separated, and the second plate part (12) is formed with a through-pass into which the shank part (S) of the bolt (B) can be inserted.
【課題】梁の直交部分などの建築部材にボルトを仮固定することができる固定クリップを提供する。【解決手段】本発明の固定クリップ(10)は、間隔を隔てて対向する第1および第2プレート部(12)と、基端縁同士を接続する第3プレート部(13)と、第2プレート部(12)の両側縁から立ち上がり第1プレート部(11)に向かって突出し、ボルト(B)の頭部(H)を支持する一対の壁部(15)とを備えている。第1プレート部(11)には、先端縁から第3プレート部(13)に向かって切り欠かれ、ボルト(B)の軸部(S)が挿入可能な切り欠き(14)が形成され、第1プレート部(11)または第3プレート部(13)には、切り欠き(14)を含む領域(10r)を分離可能にするための切断線がさらに形成され、第2プレート部(12)には、ボルト(B)の軸部(S)が挿入可能な貫通穴が形成されている。【選択図】図17
FIXING CLIP
固定クリップ
OYAMA MAKOTO (author) / TANAKA KIYOSHI (author)
2015-10-22
Patent
Electronic Resource
Japanese
IPC:
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS