A platform for research: civil engineering, architecture and urbanism
SUPPORT MOUNTING BRACKET FOR FENCE BEAM
PROBLEM TO BE SOLVED: To provide a support mounting bracket for a fence beam, which can reduce working manpower for mounting work by temporary placing of the fence beam, and which can increase working efficiency by reducing work steps for the mounting work.SOLUTION: A support mounting bracket for a fence beam makes the fence beam mounted on a line connecting support shaft centers between the supports S. A pair of combination members 2 and 2', which is attached to the support S by being combined together and which sandwiches an end of the fence beam B in between, is provided. The pair of combination members 2 and 2' is provided with beam retainer parts (bottom parts 40 and 50 and side parts 41 and 51) capable of being loaded with the end of the fence beam B in a combined state. An upper part of the beam retainer part is released to enable insertion of the fence beam B in a state in which the pair of combination members 2 and 2' is combined together.
【課題】柵ビームの仮置きにより取付作業の作業人員を低減することができると共に、取付作業の作業工程を削減して作業効率を向上することができる柵ビームの支柱取付金具を提供する。【解決手段】支柱S間の支柱軸中心同士を結んだ線上に柵ビームを取り付ける柵ビームの支柱取付金具において、組み合わされることにより、支柱Sに取り付けられ、柵ビームBの端部を間に挟持する一対の組合せ部材2、2’を備え、この一対の組合せ部材2、2’に、組み合わされた状態で柵ビームBの端部を載置可能なビーム受部(底部40、50、側部41、51)を設け、このビーム受部を、一対の組合せ部材2、2’が組み合わされた状態で、柵ビームBを挿通可能なように上方を解放する。【選択図】図1
SUPPORT MOUNTING BRACKET FOR FENCE BEAM
PROBLEM TO BE SOLVED: To provide a support mounting bracket for a fence beam, which can reduce working manpower for mounting work by temporary placing of the fence beam, and which can increase working efficiency by reducing work steps for the mounting work.SOLUTION: A support mounting bracket for a fence beam makes the fence beam mounted on a line connecting support shaft centers between the supports S. A pair of combination members 2 and 2', which is attached to the support S by being combined together and which sandwiches an end of the fence beam B in between, is provided. The pair of combination members 2 and 2' is provided with beam retainer parts (bottom parts 40 and 50 and side parts 41 and 51) capable of being loaded with the end of the fence beam B in a combined state. An upper part of the beam retainer part is released to enable insertion of the fence beam B in a state in which the pair of combination members 2 and 2' is combined together.
【課題】柵ビームの仮置きにより取付作業の作業人員を低減することができると共に、取付作業の作業工程を削減して作業効率を向上することができる柵ビームの支柱取付金具を提供する。【解決手段】支柱S間の支柱軸中心同士を結んだ線上に柵ビームを取り付ける柵ビームの支柱取付金具において、組み合わされることにより、支柱Sに取り付けられ、柵ビームBの端部を間に挟持する一対の組合せ部材2、2’を備え、この一対の組合せ部材2、2’に、組み合わされた状態で柵ビームBの端部を載置可能なビーム受部(底部40、50、側部41、51)を設け、このビーム受部を、一対の組合せ部材2、2’が組み合わされた状態で、柵ビームBを挿通可能なように上方を解放する。【選択図】図1
SUPPORT MOUNTING BRACKET FOR FENCE BEAM
柵ビームの支柱取付金具
SUZUKI YUJI (author) / KIMURA HIDENARI (author) / MIZUOCHI RYOSUKE (author)
2015-10-29
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.