COLLECTION METHOD OF GROUND WATER
PROBLEM TO BE SOLVED: To grasp concentration of harmful substances originally contained in ground water without newly installing an observation well for grand water collection.SOLUTION: In a collection method of ground water according to the present invention, first, a casing 1 is erected in a drilling hole, while forming a drilling hole 3 in a ground 2 (step 101). Next, a gravel 12 is filled into an inner space of the casing 1 in such a manner of being piled up on a drilling bottom 11 located in the lower end vicinity of the casing 1 (step 103). Next, with a filling height h of the gravel 12 as an upper limit, the casing 1 is pulled up (step 104). Next, the grand water which flows into the drilling hole 3 from a porous wall 13 and the drilling bottom 11 and further flows into the casing 1 by passing through a gap of the gravel 12 is collected (step 105). When the grand water is collected, the casing 1 is pulled up and removed (step 106).
【課題】地下水採取のための観測井をあらたに設置することなく、しかも地下水中に元々含まれていた有害物質の濃度を把握する。【解決手段】本発明に係る地下水の採取方法においては、まず、地盤2に掘削孔3を形成しつつ、該掘削孔にケーシング1を立て込む(ステップ101)。次に、ケーシング1の上端開口から砂利12を投入することにより、ケーシング1の下端近傍に位置する掘削底11に積み上げる形で、砂利12をケーシング1の内部空間に充填する(ステップ103)。次に、砂利12の充填高さhを上限として、ケーシング1を引き上げる(ステップ104)。次に、孔壁13及び掘削底11から掘削孔3に流入し、さらに砂利12の間隙を通過してケーシング1内に流入した地下水を採取する(ステップ105)。地下水を採取したならば、ケーシング1を引抜き撤去する(ステップ106)。【選択図】 図1
COLLECTION METHOD OF GROUND WATER
PROBLEM TO BE SOLVED: To grasp concentration of harmful substances originally contained in ground water without newly installing an observation well for grand water collection.SOLUTION: In a collection method of ground water according to the present invention, first, a casing 1 is erected in a drilling hole, while forming a drilling hole 3 in a ground 2 (step 101). Next, a gravel 12 is filled into an inner space of the casing 1 in such a manner of being piled up on a drilling bottom 11 located in the lower end vicinity of the casing 1 (step 103). Next, with a filling height h of the gravel 12 as an upper limit, the casing 1 is pulled up (step 104). Next, the grand water which flows into the drilling hole 3 from a porous wall 13 and the drilling bottom 11 and further flows into the casing 1 by passing through a gap of the gravel 12 is collected (step 105). When the grand water is collected, the casing 1 is pulled up and removed (step 106).
【課題】地下水採取のための観測井をあらたに設置することなく、しかも地下水中に元々含まれていた有害物質の濃度を把握する。【解決手段】本発明に係る地下水の採取方法においては、まず、地盤2に掘削孔3を形成しつつ、該掘削孔にケーシング1を立て込む(ステップ101)。次に、ケーシング1の上端開口から砂利12を投入することにより、ケーシング1の下端近傍に位置する掘削底11に積み上げる形で、砂利12をケーシング1の内部空間に充填する(ステップ103)。次に、砂利12の充填高さhを上限として、ケーシング1を引き上げる(ステップ104)。次に、孔壁13及び掘削底11から掘削孔3に流入し、さらに砂利12の間隙を通過してケーシング1内に流入した地下水を採取する(ステップ105)。地下水を採取したならば、ケーシング1を引抜き撤去する(ステップ106)。【選択図】 図1
COLLECTION METHOD OF GROUND WATER
地下水の採取方法
SATO YUKO (author) / SAWA KOICHIRO (author) / MIURA TOSHIHIKO (author)
2015-11-09
Patent
Electronic Resource
Japanese
GROUND SAMPLE COLLECTION DEVICE, GUIDE BODY, AND GROUND SAMPLE COLLECTION METHOD
European Patent Office | 2022
|Review of Ground Water Collection and Development Methods
Wiley | 1947
|European Patent Office | 2024
|