A platform for research: civil engineering, architecture and urbanism
REINFORCEMENT EARTH STRUCTURE OF SLOPE FACE HAVING LONG-TERM DURABILITY
PROBLEM TO BE SOLVED: To provide a reinforcement earth structure of a slope face capable of restraining the deterioration in the slope face with long-term durability, since deteriorated cases are many in collapse time of requiring the function of a body, when durability-short cases are many in reinforcement earth work of the slope face.SOLUTION: A reinforcement material 2 is arranged inside a grout material 11 filled in a hole 1 bored in the ground C from a slope face, and a plurality of load transmission rods 3 are arranged on its periphery along the reinforcement material 2, and the tip side of the load transmission rods 3 is mutually connected to the peripheral grout material 11 in a tip side section D1 of the reinforcement material, and the ground surface side of the load transmission rods 3 is mutually connected to the peripheral grout material 11 of a sleeve pipe 5 for covering a ground surface side section D2 of the reinforcement material. The reinforcement material 2 is extended on the inside of the sleeve pipe 5 by tensioning a ground surface side head part of the reinforcement material 2, and prestress is applied between the tip side and the ground surface side of the reinforcement material 2.
【課題】斜面の補強土工は耐久性が短い場合が多く、本体の機能が必要とされる崩壊時点では老朽化している場合が多い。そこで、長期耐久性を持ち斜面の劣化を抑制できる斜面の補強土構造を提供する。【解決手段】斜面から地盤Cに穿孔した穴1に充填したグラウト材11の内部に、補強材2を配置すると共に、補強材2に沿わせてその周囲に複数本の荷重伝達棒3を配置し、荷重伝達棒3の先端側を補強材の先端側の区間D1で周囲のグラウト材11と互いに連結し、荷重伝達棒3の地表側を補強材の地表側の区間D2を被覆するスリーブ管5の周囲のグラウト材11と互いに連結する。補強材2の地表側の頭部を緊張して、スリーブ管5の内部で補強材2を伸長し、補強材2の先端側と地表側の間にプレストレスを架ける。【選択図】図1
REINFORCEMENT EARTH STRUCTURE OF SLOPE FACE HAVING LONG-TERM DURABILITY
PROBLEM TO BE SOLVED: To provide a reinforcement earth structure of a slope face capable of restraining the deterioration in the slope face with long-term durability, since deteriorated cases are many in collapse time of requiring the function of a body, when durability-short cases are many in reinforcement earth work of the slope face.SOLUTION: A reinforcement material 2 is arranged inside a grout material 11 filled in a hole 1 bored in the ground C from a slope face, and a plurality of load transmission rods 3 are arranged on its periphery along the reinforcement material 2, and the tip side of the load transmission rods 3 is mutually connected to the peripheral grout material 11 in a tip side section D1 of the reinforcement material, and the ground surface side of the load transmission rods 3 is mutually connected to the peripheral grout material 11 of a sleeve pipe 5 for covering a ground surface side section D2 of the reinforcement material. The reinforcement material 2 is extended on the inside of the sleeve pipe 5 by tensioning a ground surface side head part of the reinforcement material 2, and prestress is applied between the tip side and the ground surface side of the reinforcement material 2.
【課題】斜面の補強土工は耐久性が短い場合が多く、本体の機能が必要とされる崩壊時点では老朽化している場合が多い。そこで、長期耐久性を持ち斜面の劣化を抑制できる斜面の補強土構造を提供する。【解決手段】斜面から地盤Cに穿孔した穴1に充填したグラウト材11の内部に、補強材2を配置すると共に、補強材2に沿わせてその周囲に複数本の荷重伝達棒3を配置し、荷重伝達棒3の先端側を補強材の先端側の区間D1で周囲のグラウト材11と互いに連結し、荷重伝達棒3の地表側を補強材の地表側の区間D2を被覆するスリーブ管5の周囲のグラウト材11と互いに連結する。補強材2の地表側の頭部を緊張して、スリーブ管5の内部で補強材2を伸長し、補強材2の先端側と地表側の間にプレストレスを架ける。【選択図】図1
REINFORCEMENT EARTH STRUCTURE OF SLOPE FACE HAVING LONG-TERM DURABILITY
長期耐久性を有する斜面の補強土構造
MITA KAZURO (author)
2015-12-14
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SLOPE FACE REINFORCEMENT STRUCTURE AND SLOPE FACE REINFORCEMENT METHOD
European Patent Office | 2017
|REINFORCEMENT STRUCTURE OF SLOPE FACE AND REINFORCEMENT METHOD OF SLOPE FACE
European Patent Office | 2018
|European Patent Office | 2016
|Evaluation of polyester reinforcement for long term durability
British Library Conference Proceedings | 2004
|METHOD FOR REINFORCING SLOPE FACE, AND REINFORCEMENT BODY OF SLOPE FACE
European Patent Office | 2015
|