FOUNDATION CONSTRUCTION METHOD AND FOUNDATION CONSTRUCTION SYSTEM
PROBLEM TO BE SOLVED: To provide a foundation construction method capable of driving a long pile member efficiently at a high accuracy and low costs, even into a soft ground.SOLUTION: A foundation construction method is for constructing a foundation 1, with a guide member 10 provided with a tube part 12 and at least two pile members 20 inserted into the tube part 12 of the guide member 10, the tube part 12 having a central axis inclined from the vertical direction and extending without interfering with each other. The foundation construction method includes steps S1, S2 in which the guide member 10 is temporarily fixed on a ground surface, steps S3 to S7 in which the pile member 20 is inserted into the tube part 12 of the guide member 10 and at least a tip of the pile member 20 is driven into the ground, a step S8 for calculating the bearing capacity of the pile member 20 based on the amount of time needed for driving the pile member 20, and a step S9 for determining whether or not the position of the guide member 10 and the bearing capacity of the pile member 20 are within a prescribed tolerance.
【課題】軟弱地盤においても、長い杭部材を効率的かつ高精度で安価に打ち込むことができる基礎構築方法を提供すること。【解決手段】基礎構築方法は、筒部12が設けられたガイド部材10と、このガイド部材10の筒部12に挿通される少なくとも2本の杭部材20と、を備え、筒部12の中心軸は、鉛直方向に対して傾斜してかつ互いに干渉することなく延びる基礎1を構築する方法である。この基礎構築方法は、ガイド部材10を地表面に仮固定するステップS1、S2と、ガイド部材10の筒部12に杭部材20を差し込んで、杭部材20の少なくとも先端部を地中に打ち込むステップS3〜S7と、杭部材20の打ち込みにかかる時間に基づいて杭部材20の支持力を算定するステップS8と、ガイド部材10の位置および杭部材20の支持力が所定の誤差の範囲内であるか否かを判定するステップS9と、を備える。【選択図】図9
FOUNDATION CONSTRUCTION METHOD AND FOUNDATION CONSTRUCTION SYSTEM
PROBLEM TO BE SOLVED: To provide a foundation construction method capable of driving a long pile member efficiently at a high accuracy and low costs, even into a soft ground.SOLUTION: A foundation construction method is for constructing a foundation 1, with a guide member 10 provided with a tube part 12 and at least two pile members 20 inserted into the tube part 12 of the guide member 10, the tube part 12 having a central axis inclined from the vertical direction and extending without interfering with each other. The foundation construction method includes steps S1, S2 in which the guide member 10 is temporarily fixed on a ground surface, steps S3 to S7 in which the pile member 20 is inserted into the tube part 12 of the guide member 10 and at least a tip of the pile member 20 is driven into the ground, a step S8 for calculating the bearing capacity of the pile member 20 based on the amount of time needed for driving the pile member 20, and a step S9 for determining whether or not the position of the guide member 10 and the bearing capacity of the pile member 20 are within a prescribed tolerance.
【課題】軟弱地盤においても、長い杭部材を効率的かつ高精度で安価に打ち込むことができる基礎構築方法を提供すること。【解決手段】基礎構築方法は、筒部12が設けられたガイド部材10と、このガイド部材10の筒部12に挿通される少なくとも2本の杭部材20と、を備え、筒部12の中心軸は、鉛直方向に対して傾斜してかつ互いに干渉することなく延びる基礎1を構築する方法である。この基礎構築方法は、ガイド部材10を地表面に仮固定するステップS1、S2と、ガイド部材10の筒部12に杭部材20を差し込んで、杭部材20の少なくとも先端部を地中に打ち込むステップS3〜S7と、杭部材20の打ち込みにかかる時間に基づいて杭部材20の支持力を算定するステップS8と、ガイド部材10の位置および杭部材20の支持力が所定の誤差の範囲内であるか否かを判定するステップS9と、を備える。【選択図】図9
FOUNDATION CONSTRUCTION METHOD AND FOUNDATION CONSTRUCTION SYSTEM
基礎構築方法および基礎構築システム
KISHIDA TSUNEAKI (author) / SAKAMI TAKUYA (author) / TANAKA HIROYASU (author) / NAKANISHI HOMARE (author)
2015-12-21
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
FOUNDATION CONSTRUCTION METHOD AND FOUNDATION CONSTRUCTION SYSTEM
European Patent Office | 2016
|Single-foundation construction elevator foundation and construction method
European Patent Office | 2024
|European Patent Office | 2015
|