PLUMBING SYSTEM CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a plumbing system construction method capable of suppressing the leakage of a hardened material at a time of filling a through-hole formed in a floor slab in a state of inserting pipes into the floor slab.SOLUTION: The present invention provides a plumbing system construction method for securing pipes 3 to an interior of a through-hole Aformed in a slab 1 using a hardened material. The method comprises: an arrangement step of arranging the pipes 3 so as to close a lower end opening portion E of the through-hole Ausing a reception member 20 into which the pipes 3 can be inserted in a state of inserting the pipes 3 into the reception member 20; a spread step of spreading particulate matters P over the reception member 20; a filling step of filling a hardened material M from above the particulate matters P; and a removal step of removing the reception member 20 and the particulate matters P after the hardened material M is hardened.
【課題】配管を挿通させた状態で床スラブに形成した貫通孔を穴埋めするときに、硬化材料の漏れ出しが抑制される配管システムの施工方法を提供する。【解決手段】本発明は、スラブ1に形成された貫通孔A1の内側に配管3が硬化材料を用いて固定される配管システムの施工方法である。配管3を挿通可能な受け部材20を用い、配管3を受け部材20に挿通させた状態で、貫通孔A1の下端開口部Eを閉じるように配置する配置工程と、受け部材20に粒状物Pを敷き詰める敷詰工程と、粒状物Pの上から硬化材料Mを充填する充填工程と、硬化材料Mが硬化したのち、受け部材20および粒状物Pを除去する除去工程とを有する。【選択図】図6
PLUMBING SYSTEM CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a plumbing system construction method capable of suppressing the leakage of a hardened material at a time of filling a through-hole formed in a floor slab in a state of inserting pipes into the floor slab.SOLUTION: The present invention provides a plumbing system construction method for securing pipes 3 to an interior of a through-hole Aformed in a slab 1 using a hardened material. The method comprises: an arrangement step of arranging the pipes 3 so as to close a lower end opening portion E of the through-hole Ausing a reception member 20 into which the pipes 3 can be inserted in a state of inserting the pipes 3 into the reception member 20; a spread step of spreading particulate matters P over the reception member 20; a filling step of filling a hardened material M from above the particulate matters P; and a removal step of removing the reception member 20 and the particulate matters P after the hardened material M is hardened.
【課題】配管を挿通させた状態で床スラブに形成した貫通孔を穴埋めするときに、硬化材料の漏れ出しが抑制される配管システムの施工方法を提供する。【解決手段】本発明は、スラブ1に形成された貫通孔A1の内側に配管3が硬化材料を用いて固定される配管システムの施工方法である。配管3を挿通可能な受け部材20を用い、配管3を受け部材20に挿通させた状態で、貫通孔A1の下端開口部Eを閉じるように配置する配置工程と、受け部材20に粒状物Pを敷き詰める敷詰工程と、粒状物Pの上から硬化材料Mを充填する充填工程と、硬化材料Mが硬化したのち、受け部材20および粒状物Pを除去する除去工程とを有する。【選択図】図6
PLUMBING SYSTEM CONSTRUCTION METHOD
配管システムの施工方法
MARUYAMA HIDEYUKI (author)
2016-01-07
Patent
Electronic Resource
Japanese