A platform for research: civil engineering, architecture and urbanism
PROBLEM TO BE SOLVED: To provide a barricade construction fence capable of coping with various stands different in a clamp position, and also easily executing an adjustment of a connection angle of the fence, partial opening-closing and even partial removal.SOLUTION: Guide rails 11 and 11 in the longitudinal direction are provided in at least one part above and below a lateral side frame of a fence body 1, and a runner part 21 is provided on one end of a connection arm 2, and in a state of installing this runner part 21 on the guide rail 11, the connection arms 2, 2, etc. are slidably installed in the vertical direction in a side frame of a fence body 1, on the one hand, rod-like parts 22 and 22 for installing a clamp C of a barricade stand S are formed in an intermediate part of the connection arms 2, 2, etc., and an irregular part is vertically fitted to an outside end part of the connection arms 2 and 2 installed in a bilateral symmetry position of the fence body 1, and comprises a pair of hinge top parts 23 and 23 connectable by a hinge.
【課題】 クランプ位置の異なる多様なスタンドに対応可能で、更にフェンスの連結角度の調節や部分開閉、部分撤去も容易に行えるバリケード構築用フェンスを提供すること。【解決手段】 フェンス本体1の左右側枠の上下少なくとも一方の部位に、縦方向のガイドレール11・11を設けると共に、前記連結アーム2の一端にはランナー部21を設けて、このランナー部21を前記ガイドレール11に取着した状態で、フェンス本体1の側枠に連結アーム2・2…を上下方向にスライド自在に装着する一方、前記連結アーム2・2…の中間部位には、バリケード用スタンドSのクランプCを装着する棒状部22・22を形成すると共に、フェンス本体1の左右対称位置に取着される連結アーム2・2の外側端部には、凹凸部を上下に嵌合させてヒンジ連結可能な一対の蝶番コマ部23・23を設けて構成した。【選択図】 図1
PROBLEM TO BE SOLVED: To provide a barricade construction fence capable of coping with various stands different in a clamp position, and also easily executing an adjustment of a connection angle of the fence, partial opening-closing and even partial removal.SOLUTION: Guide rails 11 and 11 in the longitudinal direction are provided in at least one part above and below a lateral side frame of a fence body 1, and a runner part 21 is provided on one end of a connection arm 2, and in a state of installing this runner part 21 on the guide rail 11, the connection arms 2, 2, etc. are slidably installed in the vertical direction in a side frame of a fence body 1, on the one hand, rod-like parts 22 and 22 for installing a clamp C of a barricade stand S are formed in an intermediate part of the connection arms 2, 2, etc., and an irregular part is vertically fitted to an outside end part of the connection arms 2 and 2 installed in a bilateral symmetry position of the fence body 1, and comprises a pair of hinge top parts 23 and 23 connectable by a hinge.
【課題】 クランプ位置の異なる多様なスタンドに対応可能で、更にフェンスの連結角度の調節や部分開閉、部分撤去も容易に行えるバリケード構築用フェンスを提供すること。【解決手段】 フェンス本体1の左右側枠の上下少なくとも一方の部位に、縦方向のガイドレール11・11を設けると共に、前記連結アーム2の一端にはランナー部21を設けて、このランナー部21を前記ガイドレール11に取着した状態で、フェンス本体1の側枠に連結アーム2・2…を上下方向にスライド自在に装着する一方、前記連結アーム2・2…の中間部位には、バリケード用スタンドSのクランプCを装着する棒状部22・22を形成すると共に、フェンス本体1の左右対称位置に取着される連結アーム2・2の外側端部には、凹凸部を上下に嵌合させてヒンジ連結可能な一対の蝶番コマ部23・23を設けて構成した。【選択図】 図1
BARRICADE CONSTRUCTION FENCE
バリケード構築用フェンス
MORI AKIHIRO (author)
2016-01-12
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
BARRICADE MATERIAL FOR VEHICLE PASSAGE REGULATION AND BARRICADE CONSTRUCTION METHOD
European Patent Office | 2019
|BARRICADE AND FENCE ASSEMBLY FOR POWER TRANSMISSION TOWERS USING THE SAME
European Patent Office | 2024
|