A platform for research: civil engineering, architecture and urbanism
TILE INSTALLATION METHOD AND EXTERNAL WALL TILE STRUCTURE
PROBLEM TO BE SOLVED: To provide a highly durable tile installation method that offers high workability and adhesiveness with concrete, without peeling and falling.SOLUTION: A tile installation method comprises: a step (A) for performing surface treatment (A1)2 on skeleton concrete; a step (B) for applying polymer cement mortar base adjustment mortar (a)3 that includes a fiber on the surface provided with the surface treatment 2(A1); a step (C) for performing a surface treatment (C1)4 again on a surface of the base adjustment mortar (a)3; and a step (D) for covering the surface provided with the surface treatment (C1)4 with a tile, using a polymer cement mortar adhesive (b)5 containing a light-weight fine aggregate and a fiber.
【課題】施工性及びコンクリートとの付着性に優れ、剥離、剥落のない耐久性に優れたタイルの施工方法を提供する。【解決手段】躯体コンクリートに下地処理(A1)2を施す工程(A)、下地処理2(A1)を施した面に繊維を含有するポリマーセメントモルタル系下地調整モルタル(a)3を施工しタイル下地を形成する工程(B)、下地調整モルタル(a)3の表面に再度下地処理(C1)4を施す工程(C)、および下地処理(C1)4を施した面に軽量細骨材及び繊維を含有するポリマーセメントモルタル系接着材(b)5でタイルを張る工程(D)からなる。【選択図】図1
TILE INSTALLATION METHOD AND EXTERNAL WALL TILE STRUCTURE
PROBLEM TO BE SOLVED: To provide a highly durable tile installation method that offers high workability and adhesiveness with concrete, without peeling and falling.SOLUTION: A tile installation method comprises: a step (A) for performing surface treatment (A1)2 on skeleton concrete; a step (B) for applying polymer cement mortar base adjustment mortar (a)3 that includes a fiber on the surface provided with the surface treatment 2(A1); a step (C) for performing a surface treatment (C1)4 again on a surface of the base adjustment mortar (a)3; and a step (D) for covering the surface provided with the surface treatment (C1)4 with a tile, using a polymer cement mortar adhesive (b)5 containing a light-weight fine aggregate and a fiber.
【課題】施工性及びコンクリートとの付着性に優れ、剥離、剥落のない耐久性に優れたタイルの施工方法を提供する。【解決手段】躯体コンクリートに下地処理(A1)2を施す工程(A)、下地処理2(A1)を施した面に繊維を含有するポリマーセメントモルタル系下地調整モルタル(a)3を施工しタイル下地を形成する工程(B)、下地調整モルタル(a)3の表面に再度下地処理(C1)4を施す工程(C)、および下地処理(C1)4を施した面に軽量細骨材及び繊維を含有するポリマーセメントモルタル系接着材(b)5でタイルを張る工程(D)からなる。【選択図】図1
TILE INSTALLATION METHOD AND EXTERNAL WALL TILE STRUCTURE
タイル施工方法及び外壁タイル構造
SAEKI TOSHIYUKI (author)
2016-01-21
Patent
Electronic Resource
Japanese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
TILE EXTERNAL WALL AND CONSTRUCTION METHOD OF TILE EXTERNAL WALL
European Patent Office | 2020
|European Patent Office | 2020
|European Patent Office | 2020
|