A platform for research: civil engineering, architecture and urbanism
REINFORCEMENT BINDING AUXILIARY TOOL
PROBLEM TO BE SOLVED: To develop a reinforcement binding auxiliary tool capable of realizing an efficiency increase in reinforcement binding work and shortening of time, by reducing a binding place of a crossing part of a reinforcement by a binding wire for reinforcement work more than usual, in the reinforcement binding work after reinforcement bar arrangement in the reinforcement work.SOLUTION: A reinforcement binding auxiliary tool 1 of the present invention is constituted so that a hooking position 3a of a hooking part 3 and a set position 4a in conformity with a crossing part of a reinforcement by a binding auxiliary part 4 become the same height position, by providing the slipping-out preventive hooking part 3 and the binding auxiliary part 4 for assisting binding of the crossing part of the reinforcement, in a plurality at a predetermined interval, in a reinforcement binding auxiliary tool body 2. The reinforcement binding auxiliary tool 1 is used along the crossing part of the reinforcement in a state of hooking its hooking part 3 on an optional reinforcement, and among the crossing part of the reinforcement along the reinforcement binding auxiliary tool 1, at least one place is bound by a binding wire for reinforcement work, so that a binding place of reinforcement binding work can be reduced.
【課題】鉄筋工事での鉄筋配筋後の鉄筋結束作業において、鉄筋工事用結束線による鉄筋の交叉部の結束箇所を従来よりも少なくし、鉄筋結束作業の効率化と時間の短縮化が実現できる鉄筋結束補助具を開発すること。【解決手段】本発明の鉄筋結束補助具1は、鉄筋結束補助具本体2に外れ止め用の引掛け部3と、鉄筋の交叉部の結束を補助する結束補助部4を所定の間隔で複数個設け、かつ、引掛け部3の引掛け位置3aと結束補助部4による鉄筋の交叉部に即しての設定位置4aとを同じ高さ位置になるように構成している。鉄筋結束補助具1はその引掛け部3を任意の鉄筋に引掛けた状態で鉄筋の交叉部に沿って使用し、鉄筋結束補助具1に沿った鉄筋の交叉部のうち少なくとも1か所を鉄筋工事用結束線で結束することによって、鉄筋結束作業の結束箇所を少なくすることができる。【選択図】図1
REINFORCEMENT BINDING AUXILIARY TOOL
PROBLEM TO BE SOLVED: To develop a reinforcement binding auxiliary tool capable of realizing an efficiency increase in reinforcement binding work and shortening of time, by reducing a binding place of a crossing part of a reinforcement by a binding wire for reinforcement work more than usual, in the reinforcement binding work after reinforcement bar arrangement in the reinforcement work.SOLUTION: A reinforcement binding auxiliary tool 1 of the present invention is constituted so that a hooking position 3a of a hooking part 3 and a set position 4a in conformity with a crossing part of a reinforcement by a binding auxiliary part 4 become the same height position, by providing the slipping-out preventive hooking part 3 and the binding auxiliary part 4 for assisting binding of the crossing part of the reinforcement, in a plurality at a predetermined interval, in a reinforcement binding auxiliary tool body 2. The reinforcement binding auxiliary tool 1 is used along the crossing part of the reinforcement in a state of hooking its hooking part 3 on an optional reinforcement, and among the crossing part of the reinforcement along the reinforcement binding auxiliary tool 1, at least one place is bound by a binding wire for reinforcement work, so that a binding place of reinforcement binding work can be reduced.
【課題】鉄筋工事での鉄筋配筋後の鉄筋結束作業において、鉄筋工事用結束線による鉄筋の交叉部の結束箇所を従来よりも少なくし、鉄筋結束作業の効率化と時間の短縮化が実現できる鉄筋結束補助具を開発すること。【解決手段】本発明の鉄筋結束補助具1は、鉄筋結束補助具本体2に外れ止め用の引掛け部3と、鉄筋の交叉部の結束を補助する結束補助部4を所定の間隔で複数個設け、かつ、引掛け部3の引掛け位置3aと結束補助部4による鉄筋の交叉部に即しての設定位置4aとを同じ高さ位置になるように構成している。鉄筋結束補助具1はその引掛け部3を任意の鉄筋に引掛けた状態で鉄筋の交叉部に沿って使用し、鉄筋結束補助具1に沿った鉄筋の交叉部のうち少なくとも1か所を鉄筋工事用結束線で結束することによって、鉄筋結束作業の結束箇所を少なくすることができる。【選択図】図1
REINFORCEMENT BINDING AUXILIARY TOOL
鉄筋結束補助具
ISHIBASHI KAZUYA (author)
2016-01-21
Patent
Electronic Resource
Japanese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Complex concrete reinforcement binding auxiliary device and method
European Patent Office | 2025
|Continuous binding auxiliary device for ultra-long building reinforcement cage
European Patent Office | 2021
European Patent Office | 2023
|