A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION MACHINE HYDRAULIC CIRCUIT
PROBLEM TO BE SOLVED: To make it possible to easily reduce a discharge quantity of a second pump and to suppress energy consumption if the discharge quantity of the second pump is surplus due to regeneration of pressure oil in a configuration in which discharge quantities of first and second pumps are controlled to be interlocked with each other.SOLUTION: A regeneration passage 71 carries out "pressure oil regeneration" for supplying boom discharge oil (regeneration target discharge oil) discharged from a boom cylinder 23F (regeneration target actuator) to the boom cylinder 23F (actuator operating by supplying discharge oil of a second pump 12 to the actuator). A first detection pressure increase passage 81 supplies part of boom discharge oil 35 Fo to a first unload passage 31 upstream of a first pressure detection unit 61p at a time of the pressure oil regeneration.
【課題】第1ポンプおよび第2ポンプそれぞれの吐出量が連動して制御される構成において、圧油再生が行われることで第2ポンプの吐出量が余るときに、第2ポンプの吐出量を減らしやすく、エネルギー消費を抑制できるようにする。【解決手段】再生通路71は、ブーム用シリンダ23F(再生対象アクチュエータ)から排出されたブーム排出油(再生対象排出油)を、ブーム用シリンダ23F(第2ポンプ12の吐出油が供給されることにより作動するアクチュエータ)に供給する「圧油再生」を行う。第1検知圧上昇通路81は、圧油再生が行われるときに、第1圧力検知部61pよりも上流側の第1アンロード通路31にブーム排出油35Foの一部を供給する。【選択図】図2
CONSTRUCTION MACHINE HYDRAULIC CIRCUIT
PROBLEM TO BE SOLVED: To make it possible to easily reduce a discharge quantity of a second pump and to suppress energy consumption if the discharge quantity of the second pump is surplus due to regeneration of pressure oil in a configuration in which discharge quantities of first and second pumps are controlled to be interlocked with each other.SOLUTION: A regeneration passage 71 carries out "pressure oil regeneration" for supplying boom discharge oil (regeneration target discharge oil) discharged from a boom cylinder 23F (regeneration target actuator) to the boom cylinder 23F (actuator operating by supplying discharge oil of a second pump 12 to the actuator). A first detection pressure increase passage 81 supplies part of boom discharge oil 35 Fo to a first unload passage 31 upstream of a first pressure detection unit 61p at a time of the pressure oil regeneration.
【課題】第1ポンプおよび第2ポンプそれぞれの吐出量が連動して制御される構成において、圧油再生が行われることで第2ポンプの吐出量が余るときに、第2ポンプの吐出量を減らしやすく、エネルギー消費を抑制できるようにする。【解決手段】再生通路71は、ブーム用シリンダ23F(再生対象アクチュエータ)から排出されたブーム排出油(再生対象排出油)を、ブーム用シリンダ23F(第2ポンプ12の吐出油が供給されることにより作動するアクチュエータ)に供給する「圧油再生」を行う。第1検知圧上昇通路81は、圧油再生が行われるときに、第1圧力検知部61pよりも上流側の第1アンロード通路31にブーム排出油35Foの一部を供給する。【選択図】図2
CONSTRUCTION MACHINE HYDRAULIC CIRCUIT
建設機械用油圧回路
IWASAKI HITOSHI (author)
2016-01-28
Patent
Electronic Resource
Japanese
Hydraulic circuit for construction machine, and hydraulic circuit
European Patent Office | 2023
|Hydraulic Circuit for Construction Machine, and Hydraulic Circuit
European Patent Office | 2022
|HYDRAULIC CIRCUIT FOR CONSTRUCTION MACHINE, AND HYDRAULIC CIRCUIT
European Patent Office | 2021
|HYDRAULIC CIRCUIT FOR CONSTRUCTION MACHINE, AND HYDRAULIC CIRCUIT
European Patent Office | 2020
|HYDRAULIC CIRCUIT FOR CONSTRUCTION MACHINE, AND HYDRAULIC CIRCUIT
European Patent Office | 2022
|