A platform for research: civil engineering, architecture and urbanism
ANCHOR WEIGHT
PROBLEM TO BE SOLVED: To provide an anchor weight for a construction site, the anchor weight being of a simple configuration and capable of stably fix both a fence and a barricade.SOLUTION: An anchor weight 1 is used as a weight for fixing a fence or a barricade at a construction site, and includes a top plate part 2, and a side plate part 3 extending downward from both side parts 21 of the top plate part 2. The top plate part 2 has an insertion hole 23 formed through which a support post of the fence is inserted, while the side plate part 3 has a hooking recess 32 formed for hooking to a crossbar of the barricade. A space is formed below the top plate part 2 because of the side plate parts 3, while the top plate part 2 keeps the side plate parts 3 separated with an interval in between. Thus, the top plate part 2 and the side plate part 3 complement each other, allowing both the fence and the barricade to be stably fixed with a simple configuration, and therefore reducing manufacturing costs.SELECTED DRAWING: Figure 1
【課題】簡易な構成にしてフェンスとバリケードの双方を安定して固定することができる工事現場用のアンカーウェイトを提供する。【解決手段】アンカーウェイト1は、工事現場でフェンスまたはバリケードを固定するためのおもりとして用いられるアンカーウェイトであって、天板部2と、天板部2の両側部21から下方に立設された側板部3とを備え、天板部2は、フェンスの支柱が挿入されるための挿入孔23が設けられ、側板部3は、バリケードの一の横桟に引っ掛けるための引掛凹部32が設けられている。側板部3により天板部2の下方に空間が形成されている一方、天板部2により側板部3が間隔を隔てて設けられていることにより、天板部2と側板部3は相互に補完し合うため、簡易な構成にしてフェンスとバリケードの双方を安定して固定することができ、ひいては製造コストを低減することが可能となる。【選択図】図1
ANCHOR WEIGHT
PROBLEM TO BE SOLVED: To provide an anchor weight for a construction site, the anchor weight being of a simple configuration and capable of stably fix both a fence and a barricade.SOLUTION: An anchor weight 1 is used as a weight for fixing a fence or a barricade at a construction site, and includes a top plate part 2, and a side plate part 3 extending downward from both side parts 21 of the top plate part 2. The top plate part 2 has an insertion hole 23 formed through which a support post of the fence is inserted, while the side plate part 3 has a hooking recess 32 formed for hooking to a crossbar of the barricade. A space is formed below the top plate part 2 because of the side plate parts 3, while the top plate part 2 keeps the side plate parts 3 separated with an interval in between. Thus, the top plate part 2 and the side plate part 3 complement each other, allowing both the fence and the barricade to be stably fixed with a simple configuration, and therefore reducing manufacturing costs.SELECTED DRAWING: Figure 1
【課題】簡易な構成にしてフェンスとバリケードの双方を安定して固定することができる工事現場用のアンカーウェイトを提供する。【解決手段】アンカーウェイト1は、工事現場でフェンスまたはバリケードを固定するためのおもりとして用いられるアンカーウェイトであって、天板部2と、天板部2の両側部21から下方に立設された側板部3とを備え、天板部2は、フェンスの支柱が挿入されるための挿入孔23が設けられ、側板部3は、バリケードの一の横桟に引っ掛けるための引掛凹部32が設けられている。側板部3により天板部2の下方に空間が形成されている一方、天板部2により側板部3が間隔を隔てて設けられていることにより、天板部2と側板部3は相互に補完し合うため、簡易な構成にしてフェンスとバリケードの双方を安定して固定することができ、ひいては製造コストを低減することが可能となる。【選択図】図1
ANCHOR WEIGHT
アンカーウェイト
HARADA NOBUAKI (author) / TAKABUCHI YUKIO (author)
2016-04-04
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
ANCHOR, ANCHOR EXTRACTING TOOL, ANCHOR UNIT, AND ANCHOR REMOVING METHOD
European Patent Office | 2020
|ANCHOR CONSTRUCTION METHOD, ANCHOR SYSTEM, ANCHOR CONSTRUCTION TOOL, AND ANCHOR
European Patent Office | 2019
|