CONSTRUCTION METHOD AND INSTALLATION STRUCTURE OF PARTITION WALL
PROBLEM TO BE SOLVED: To facilitate a construction process of a partition wall.SOLUTION: This invention provides a construction method to fix a partition wall 4, which extends along a longer direction of a ceiling joist 2, between a pair of ceiling joists 2,2 and an installation structure of the partition wall. The construction method comprises: a process S2 to fix a ceiling backing material 3 made of a face material, which continuously extends between the joists 2,2 in the longer direction, between a pair of joists 2,2; a process S3 to fix an upper runner 11 of the partition wall 4 to an undersurface of the ceiling backing material 3; a ceiling material fixing process S4 to fix the ceiling material 5 to the undersurface of the ceiling backing material 3 except for the fixed part; and a partition wall formation process S5 to finish the partition wall 4 along the upper runner 11, prior to or followed by the ceiling material fixing process S4.SELECTED DRAWING: Figure 1
【課題】間仕切り壁の施工性を高める。【解決手段】一対の野縁2、2間に、野縁2の長手方向に沿ってのびる間仕切り壁4を固定するための施工方法及び間仕切り壁の取付構造である。施工方法では、一対の野縁2、2間に、野縁2、2間をその長手方向に連続してのびる面材からなる天井下地材3を固定する工程S2と、間仕切り壁4の上部ランナー11を、天井下地材3の下面に固定する工程S3と、固定された部分を除く天井下地材3の下面に、天井材5を固定する天井材固定工程S4と、天井材固定工程S4の前又は後に行われ、かつ、上部ランナー11に沿って、間仕切り壁4を仕上げる間仕切り壁形成工程S5とを含んでいる。【選択図】図1
CONSTRUCTION METHOD AND INSTALLATION STRUCTURE OF PARTITION WALL
PROBLEM TO BE SOLVED: To facilitate a construction process of a partition wall.SOLUTION: This invention provides a construction method to fix a partition wall 4, which extends along a longer direction of a ceiling joist 2, between a pair of ceiling joists 2,2 and an installation structure of the partition wall. The construction method comprises: a process S2 to fix a ceiling backing material 3 made of a face material, which continuously extends between the joists 2,2 in the longer direction, between a pair of joists 2,2; a process S3 to fix an upper runner 11 of the partition wall 4 to an undersurface of the ceiling backing material 3; a ceiling material fixing process S4 to fix the ceiling material 5 to the undersurface of the ceiling backing material 3 except for the fixed part; and a partition wall formation process S5 to finish the partition wall 4 along the upper runner 11, prior to or followed by the ceiling material fixing process S4.SELECTED DRAWING: Figure 1
【課題】間仕切り壁の施工性を高める。【解決手段】一対の野縁2、2間に、野縁2の長手方向に沿ってのびる間仕切り壁4を固定するための施工方法及び間仕切り壁の取付構造である。施工方法では、一対の野縁2、2間に、野縁2、2間をその長手方向に連続してのびる面材からなる天井下地材3を固定する工程S2と、間仕切り壁4の上部ランナー11を、天井下地材3の下面に固定する工程S3と、固定された部分を除く天井下地材3の下面に、天井材5を固定する天井材固定工程S4と、天井材固定工程S4の前又は後に行われ、かつ、上部ランナー11に沿って、間仕切り壁4を仕上げる間仕切り壁形成工程S5とを含んでいる。【選択図】図1
CONSTRUCTION METHOD AND INSTALLATION STRUCTURE OF PARTITION WALL
間仕切り壁の施工方法、及び、間仕切り壁の取付構造
MUKAI YUTAKA (author)
2016-05-09
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2021
|Installation method of phosphogypsum board construction partition wall
European Patent Office | 2024
|Partition wall structure and installation method thereof
European Patent Office | 2015
|European Patent Office | 2024
|Partition wall construction process and partition wall structure
European Patent Office | 2021
|