A platform for research: civil engineering, architecture and urbanism
WATERPROOF SHEET LAYING METHOD AND WATERPROOF SYSTEM
PROBLEM TO BE SOLVED: To ensure more definite fixing of a waterproof sheet fixture on a waterproof substrate.SOLUTION: A waterproof sheet S is laid on a plate-like heat insulation member F laid on a waterproof substrate 1 through a waterproof sheet fixture 3 according to following processes: a process to lay the heat insulation member F on the waterproof substrate 1; a process to bore a first hole 4A penetrating the heat insulation member F from an upper side of the heat insulation member F; a process to bore a second hole 4B, which has a smaller diameter than that of the first hole 4A and continues from the first hole 4A, on the waterproof substrate 1 from the upper side of the heat insulation member F; a process to inject an adhesive V into the second hole 4B through the first hole 4A from the upper side of the heat insulation member F; a process to insert and fix an anchor plug P into the second hole 4B through the first hole 4A from the upper side of the heat insulation member F; a process to arrange the waterproof sheet fixture 3 on the heat insulation member F and insert a screw member 2 into the waterproof sheet fixture 3 and screw the anchor plug P; and a process to fix the waterproof sheet S to the waterproof sheet fixture 3.SELECTED DRAWING: Figure 6
【課題】防水下地に対する防水シート固定具の定着を、より確実に行えるようにする。【解決手段】防水下地1の上に敷設した板状断熱部材Fの上に防水シート固定具3を介して防水シートSを敷設するにあたり、防水下地1の上に断熱部材Fを敷設する工程と、断熱部材Fの上方から、断熱部材Fを貫通する第1穴4Aを穿孔する工程と、断熱部材Fの上方から、第1穴4Aよりも小径であって第1穴4Aと連続する第2穴4Bを防水下地1に穿孔する工程と、断熱部材Fの上方から、第1穴4Aを介して、第2穴4Bに接着材Vを注入する工程と、断熱部材Fの上方から、第1穴4Aを通して第2穴4BにアンカープラグPを挿入固定する工程と、断熱部材Fの上に防水シート固定具3を配置すると共に、ネジ部材2を、防水シート固定具3を挿通した状態でアンカープラグPに締め込む工程と、防水シート固定具3に防水シートSを固定する工程と、を備えている。【選択図】図6
WATERPROOF SHEET LAYING METHOD AND WATERPROOF SYSTEM
PROBLEM TO BE SOLVED: To ensure more definite fixing of a waterproof sheet fixture on a waterproof substrate.SOLUTION: A waterproof sheet S is laid on a plate-like heat insulation member F laid on a waterproof substrate 1 through a waterproof sheet fixture 3 according to following processes: a process to lay the heat insulation member F on the waterproof substrate 1; a process to bore a first hole 4A penetrating the heat insulation member F from an upper side of the heat insulation member F; a process to bore a second hole 4B, which has a smaller diameter than that of the first hole 4A and continues from the first hole 4A, on the waterproof substrate 1 from the upper side of the heat insulation member F; a process to inject an adhesive V into the second hole 4B through the first hole 4A from the upper side of the heat insulation member F; a process to insert and fix an anchor plug P into the second hole 4B through the first hole 4A from the upper side of the heat insulation member F; a process to arrange the waterproof sheet fixture 3 on the heat insulation member F and insert a screw member 2 into the waterproof sheet fixture 3 and screw the anchor plug P; and a process to fix the waterproof sheet S to the waterproof sheet fixture 3.SELECTED DRAWING: Figure 6
【課題】防水下地に対する防水シート固定具の定着を、より確実に行えるようにする。【解決手段】防水下地1の上に敷設した板状断熱部材Fの上に防水シート固定具3を介して防水シートSを敷設するにあたり、防水下地1の上に断熱部材Fを敷設する工程と、断熱部材Fの上方から、断熱部材Fを貫通する第1穴4Aを穿孔する工程と、断熱部材Fの上方から、第1穴4Aよりも小径であって第1穴4Aと連続する第2穴4Bを防水下地1に穿孔する工程と、断熱部材Fの上方から、第1穴4Aを介して、第2穴4Bに接着材Vを注入する工程と、断熱部材Fの上方から、第1穴4Aを通して第2穴4BにアンカープラグPを挿入固定する工程と、断熱部材Fの上に防水シート固定具3を配置すると共に、ネジ部材2を、防水シート固定具3を挿通した状態でアンカープラグPに締め込む工程と、防水シート固定具3に防水シートSを固定する工程と、を備えている。【選択図】図6
WATERPROOF SHEET LAYING METHOD AND WATERPROOF SYSTEM
防水シート敷設方法、及び、防水システム
OBATA HARUO (author) / FUKUDA MASAMI (author)
2016-05-16
Patent
Electronic Resource
Japanese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Waterproof coating laying device and waterproof coating laying method
European Patent Office | 2022
|Waterproof coating laying device and waterproof coating laying method
European Patent Office | 2024
|